Bronx Williamsbridge-Olinville
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Aug 19, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | MISCELLANEOUS VIOLATIONS FAILURE TO PROVIDE JOIST ANCHORAGE OF FLOOR J OIST TO MASONRY WALLS CONTRACTOR FAILED TO PROVIDE JOIST ANCHORAGE EVE RY 24 ON CENTERS ACCORDING TO CONTRACTOR JOIST WERE ANCHORED IN EACH C ORNER OF EACH FLOOR OF THIS 4 STORY BUILDING ONLY REMEDY: COMPLY WITH NOTICE PROVIDE PROPER ANCHORAGE STOP ALL WORK CALL DOB FOR REINSPECTIO |