Bronx Morrisania
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 1, 2018 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | BRACE EXP#1 WALL WITH ATTACHMENTS TO THE FLOOR FRAMING AT THE ROOF,AND 2ND FLOOR LEVELS;PER DESIGN BY LICENSED PE |
| Jun 14, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMMISSIONER ORDER #334005 ISSUED ON 4/4/18 TO HAVE AN ENG'R IMMED EVAL BLDG&PROV RPRS UND PERM,OBTAIN PERMIT BY 5/4/18&SIGNOFF PERM NO LATER THAN 7/6/18.PERM HAS NOT BEEN OBTAINED AS OF 6/14/18&NO FILING HAS BEEN DONE FOR PERMIT.REMEDY:COMPLY WITH COMMISSIONER ORDER #334005 IMMED |
| Apr 4, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM PREM IS 3 STRY+CELL SEMI ATTACH WOOD FRAMED W/MASONRY EXT WALLS MIX USE BLDG ON INT LOT.FRONT BRICK WALL SEPARATING FROM BRICK SIDE WALLS&OPEN JOINTS AT FW.EXP 2 LEFT SW HAS OPEN JOINTS&DETERIORATED MASONRY.REMEDY:OWN RET NYS PE ENG'R IMMED EVAL BLDG&PROV RPRS UND PERM OBTAIN PERM BY 5/4/18.PERM SIGNOFF TO BE NO LATER THAN 7/6/18 |
| Mar 28, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Apr 4, 2012 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 5, 1993 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |