| Jul 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER ON 7/12/23 OBSERVED BULGED MASONRY BRICKS@WEST ELEV.EXP#3@15FL&STEP CRACKED BRICKS@SO.ELE.EXP#2OWNER IS TO IMMED.PROV PLOT PLAN WITH DIMENS.NOTING THE AREAS TO BE CLOSED OFF.NO WORKS NEAR DEFECT.AREAS.INSTALL FENCE@ALL IMPACTED AREAS.INSTALL S/WALKSHED.ABOVE BLDGE ENTRA.&EXITS.RETAIN NYS REG.PE TO DIRECT&SUPERV.ALL WORKS PE |
| Jul 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN FACADE&APPURTENANCES,7/12/23 OBSERV.BULGED MASONRY BRICKS AT WEST ELE,EXP#3@15FL&STEP CRACKED BRICKS@SO.ELEV.EXP#2REMEDY: OWNER TO RETAIN SERV.OF NYS RDP WITH QEWI CERT.&MASONRY BRICK FACADE EXPER.TO INSPECT&EVAL.100%HANDS ON &PROBE THE ENTIRE MASONRY FACADE IN ORDER TO DETERM.CODE COMPLIANCE&ENSURE STABILITY OF REMAING MASONRY |
| Jul 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN FACADE&APPURT. 7/12/23 OBSER.BULGED MASONRY BRICKS @E.ELE.EXP#3@14TH FL.REMEDY:RETAIN SERV.OF NYS RDP WITH QEWI CERTL& MASONRY BRICK FACADE EXPERIENCE TO INSPECT.& EVALU.100%HANDS ON& PROBE THE ENTIRE MASONRY FACADE IN ORDER TO DETERMINE CODE COMPLIANCE&ENSURE STABILITY OF REMAING MASONRY INSTALL PUBLIC PROTECTION@ALLREG.LOCATION |
| Jul 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.ON 07-12-2023 OBSERVED BULGED MASONRY BRICKS @ E.ELEV. EXP#3 @14TH FL.THE OWNER IS TO IMMED. PROVIDE:A.PLOT PLAN WITH DIMENSIONS NOTING THE AREAS TO CLOSED OFF NO WORKS NEAR THE DEFECTED FACADE-INSTALL FENCE@ ALL IMPACTED AREAS.INSTALL S/WALK SHED ABOVE ALL BLDG ENTR.RETAIN REG.PE TO DIR.&SUPERV.ALL WORKS.SUBMIT MEANS&METHOD |
| Jul 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL.TO MAINT.FACADE&APPURT.ON 7/12/23 OBSERVED MASONRY BULGING @15TH& 16TH FL.OF EXP#3(E.)&PARAPET DISPLACEMENT @EXP#4(S.)REMEDY:RETAIN SERV OF NYS RDP WITH QEWI CERT.&MASONRY BRICK FACADE EXPERIENCE TO INSPECT &EVAL.100%HANDON&PROBE ENTIRE MASONRY FACADE ORDER TO DETER.CODE COMPL &ENSURE STABILITY ALL MASONRY.INSTALL PUB.PROTECT.ALL REG.LOCATION |
| Jul 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL.TO MAIN.FACADE&APPURT.ON 7/12/23 OBSERVED MASONRY BRICKS BULGING @EXPOSURE#3EAST ELEV.BET.15&16TH FL ALSO OBSERV.EXPO#4 SOUTH ELEV.SAME DEFECT.BULGING @15&16TH FL.REMEDY:OWNER TO RETAIN SERVICES OF NYS REG DESIGN PROFFSIONAL WITH QEWI CERT.&MASONRY BRICK FACADE EXPERIENCE TO INSPECT&EVALUATE100%HANDS ON&PROBE THE ENTIRE MASONRY FACADE.FOR COMPL |
| Jul 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:DUE TO OBSERVED BULGING MASONRY@EXPOSURE#3(EAST) @15&16TH FL&PARAPETDISPLACEMENT@EXP#4(SO.)DUE TO THESE COND.OWNER IS IMMED.PROV.A PLOT PLAN WITH DIMEN.NOTING THE AREAS TO BE CLOSED OFF NO WORK NEAR THE AREA-INSTALL FENCE@ALL INPACT AREAS-INSTALL S/WALK ABOVE ALL BLDG ENTR.PE PROV.DAILY REPTS FACADE UNIT.FACADES@BUILDING.NYC.GOV |
| Jul 12, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DEFECT.FACADE@EXP#3&4(E.&S.ELEV)BET.15&16FL.IMMED PROV.PLOT PLAN WITH DIMENSIONS.AREAS BE CLOSED OFF NO WORK NEAR AREAS INSTALL FENCE @ALL IMPACTED AREAS-INSTALL S/WALK SHEDS ABOVE ALL BLDG ENTR.&EXITS.RETAIN NYS REG.PE TO DIR,&SUPERV.ALL WORKS.SUBMIT MEANS& METHOD FOR INSTALL.OF OUTRIGGERS.REMOVE/SECURE ALL MASONRY WALLS HAZ |
| May 1, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER,DUE TO FACADE FAILURE @ EAST ELEVATION EXPOSURE#3 @14TH&15THFLOOR.PART OF DEFECTED MASONRY DIRECTLY ABOVE THE PLAYGROUND AT EAST ELEV.WHICH ARE POSING AN IMMEDIATE HAZARD TO THE PLAYGROUNG THESE CONDITIONS HAVE THEREFORE MADE THE ENTIRE PLAYGROUND@ EAST ELEV EXPO#3 UNSAFE TO BE OCCUPIED.REMEDY VACATE ENTIRE PLALYGROUND @E.ELEV |
| May 1, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN FACADE&APPURT.4/27/23 LARGE SECT.OF MASONRY BRICK FACADE BET.15-16 FL.FAILED DISLODGED &FELL ON THE S/WALK SHED@WALKWAY BELOW FOR REASONS YET TO BE DETERM.@THE E.ELEV.REMEDY:OWNER TO RETAIN SERV.NYS REG.DESIGN PROF.WITH QEWI CERT.&MASONRY BRICK FACADE EXPERIEN TO INSPECT100%HANDS&PROBE IN THE ENTIRE MASONRY FACAD |
| May 1, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN FACADE&APPURT.ON 04/27/23 A LARGE SECT.OF MASONRY BRICK FACADE BET.15,16 FL.FAILED,DISLODGED&FELL ONTO THE S/WALKSHED @WALKWAY BELOW FOR REASONS YET TO BE DETERM.@THE E.ELEV.REMEDY IMMED RETAIN SERVICE OF A NYS REG.DESIGN PROF.WITH QEWI CERT.&EXP.INVEST.IN MASONRY.BRICK FACADE FAILURE TO INSPECT PROVIDE A REPORTON CAUSE |
| Apr 27, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:DUE TO FACADE FAILURE @FL#14&15 OF EXP#3 E.ELEV DUE TO THIS FAILURE THE OWNER IS TO IMMED.PROVIDE(1)PLOT PLAN WITH DIMENSIONS NOTING THE AREAS TO BE CLOSED OFF.NO WORKS SHOULD BE NEAR THE AREA OF FAILURE(2)INSTALL FENCE @ALL IMPACTED AREAS(3)S/WALK SHED ABOVE BLDGE ENTR.(4)RETAIN NYS REG.PE TO DIR.&SUPERV.ALL WORKS |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Feb 8, 2017 | V-DOB VIOLATION - ACTIVE | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Feb 8, 2017 | V*-DOB VIOLATION - DISMISSED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Sep 2, 2016 | V*-DOB VIOLATION - DISMISSED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Sep 2, 2016 | V*-DOB VIOLATION - DISMISSED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Sep 2, 2016 | V*-DOB VIOLATION - DISMISSED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Sep 2, 2016 | V*-DOB VIOLATION - DISMISSED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Sep 2, 2016 | V*-DOB VIOLATION - DISMISSED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Sep 2, 2016 | V*-DOB VIOLATION - DISMISSED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jul 24, 2014 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Jul 24, 2014 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Jul 24, 2014 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Jul 24, 2014 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Jul 16, 2014 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Jul 16, 2014 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |