Bronx Norwood
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-03333-0009), so they can include other buildings on the same lot.
796 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Dec 21, 2024 | C | VIOLATION DISMISSED | 3F | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Dec 10, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 10, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 10, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL AT CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 10, 2024 | C | VIOLATION DISMISSED | 3F | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CHIPPED VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 10, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT STEAM RISER IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 10, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 10, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 10, 2024 | C | VIOLATION DISMISSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM |
| Dec 10, 2024 | C | VIOLATION DISMISSED | 3F | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 10, 2024 | B | VIOLATION DISMISSED | 2E | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Dec 2, 2024 | C | VIOLATION DISMISSED | 3F | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 2, 2024 | C | VIOLATION DISMISSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM |
| Dec 2, 2024 | C | VIOLATION DISMISSED | 3F | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 27, 2024 | A | VIOLATION DISMISSED | 3F | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Nov 27, 2024 | C | VIOLATION DISMISSED | 3F | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Oct 18, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT SHOWER STALL IN THE 2nd BATHROOM FROM NORTH AT EAST LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Oct 18, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WASH BASIN IN THE 2nd BATHROOM FROM NORTH AT EAST LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| May 30, 2024 | A | VIOLATION DISMISSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 4TH STORY |
| May 30, 2024 | A | VIOLATION DISMISSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 3RD STORY |
| May 30, 2024 | B | VIOLATION DISMISSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEAVY DUTY MECHANICAL LOCK SET AND ASSEMBLY AT DOOR AT STREET LEADING TO VESTIBULE, 1ST STORY |
| May 30, 2024 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AT STREET LEADING TO VESTIBULE, 1ST STORY |
| Apr 20, 2024 | A | VIOLATION DISMISSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND THE NORTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL, 3rd STORY |
| Apr 20, 2024 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AND THE NORTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL, 3rd STORY |
| Apr 20, 2024 | A | VIOLATION DISMISSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND THE NORTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL, 4th STORY |
| Apr 20, 2024 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AND THE NORTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL, 4th STORY |
| Apr 20, 2024 | B | VIOLATION CLOSED | Not available | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND THE NORTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL, 4th STORY |
| Apr 20, 2024 | A | VIOLATION DISMISSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT INTERMEDIATE LANDING AT PUBLIC HALL, 5th STORY |
| Apr 20, 2024 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT NORTH WALL ATINTERMEDIATE LANDING AT PUBLIC HALL, 5th STORY |
| Apr 20, 2024 | B | VIOLATION CLOSED | Not available | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL, 5th STORY |
| Mar 12, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 27, 2024 | A | VIOLATION DISMISSED | 3F | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT SOUTH, THE 1st BATHROOM FROM EAST AT NORTH, THE 1st BATHROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Feb 27, 2024 | C | VIOLATION CLOSED | 3F | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Feb 13, 2024 | A | VIOLATION DISMISSED | 1A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Feb 13, 2024 | C | VIOLATION DISMISSED | 1A | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Feb 13, 2024 | C | VIOLATION DISMISSED | 1A | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Feb 13, 2024 | B | VIOLATION DISMISSED | 1A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, EAST AND WEST WALLS IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Feb 13, 2024 | B | VIOLATION DISMISSED | 1A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Feb 8, 2024 | C | VIOLATION CLOSED | 2E | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE INOPERABLE HINGES IN THE ENTRANCE LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Jan 29, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 8 SQFT AT WEST WALL,, APPROX 6 SQFT AT NORTH WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jan 29, 2024 | B | VIOLATION DISMISSED | 3F | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jan 29, 2024 | C | VIOLATION CLOSED | 3F | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jan 29, 2024 | C | VIOLATION CLOSED | 3F | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 25, 2023 | C | VIOLATION CLOSED | 3F | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 25, 2023 | C | VIOLATION CLOSED | 3F | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 25, 2023 | B | VIOLATION DISMISSED | 3F | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 25, 2023 | A | VIOLATION DISMISSED | 3F | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 25, 2023 | A | VIOLATION DISMISSED | 3F | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 25, 2023 | B | VIOLATION DISMISSED | 3F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING, WEST AND EAST WALLS IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 25, 2023 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM DOOR LOCKED AT BOILER ROOM |