Bronx Bedford Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 15, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC WITH COMMISSIONER'S CONTROL#348133 VIO#032426PI20701AG DATED 03/24/26 REQUIRING THE WONER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/24/26. AS OF 05/15/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348133 VIO#032426PI20701AG |
| Mar 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP2 LOCALIZED BULGING BTWN THE 4FL & 5FL WINDOW OPENINGS NEAR EXP2/3 CORNER RESULTING IN MISALIGNED WINDOW FRAMES ALONG W/MASONRY HAIRLINE CRACK ABOVE 3FL WINDOW OPENING OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB & NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY APRIL 24 2026 |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 2, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 2, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Nov 30, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 17, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |