Bronx Kingsbridge Heights-Van Cortlandt Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
63 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Feb 6, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL A SINGLE LINE OF TEMPORARY SHORING WITH CROSS-BRACING IN BOTH DIRECTIONS ALONG THE FULL LENGTH OF BOTH CONCRETE BALCONY, COVERING APPRX 60 LINEAR FEET |
| Feb 5, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE EXP3FACADE IS IN DISREPAIR,EXHIBITNG CRCKS&DISLODGED BRICKS.THE EXP3BALCONIES HAVE VISIBLE CRACKING & HAVE BEEN DEEMED STRCTRLLY UNSTABLE.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,DETERMINE THE STRCTRL STBILITY & PREPARE/FILE RPAIR DWGS.BLDG TO BE RPAIRD |
| Oct 17, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION,OBSERVED AT EXP1 & 4 EAST & NORTH ELEV,DAMAGED PARAPET WALL,SP ALLED BRICKS,DETERIORATED MORTAR JOINTS,CRACKS THROUGHOUT FACADES.AT E XP4 NORTH ELEV DAMAGED LINTELS OBSERVED.REMEDY:REPAIR/REPLACE |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 21, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED AT AL L EXPOSURES DAMAGED PARAPET WALLS.AT DIFFERENT LEVELS OF EACH EXP OBSE RVED DAMAGED MORTAR JOINTS.AT EXP1 OBSERVED STEP CRACKS IN MULTIPLE LO CATIONS.DAMAGED WINDOW SILLS IN MULTIPLE LOCATIONS.AT EXP2 OBSERVED ST EP CRACKS DAMAGED WINDOW SILLS,MISSING BRICK.REMEDY:REPAIR OR REPLACE |
| Nov 22, 2023 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER NOTE:OBSERVED ON 08/18/2023 AT EXPO#3 AND 4 WEST NORTH ELEVATION SPALLING/CRACKED BRICK MASONRY AT SEVERAL LOCATIONS INCLUDING EX#3 WEST.ELEVATION.BOTH COURTYARD AREA.NO SAFETY MEASURS IN PLACE.QEWI FILE UNSAFE-908103.REMEDY:VACAT AT EXP#3 WEST & EXP#4 NO NORTH ELE.INCLUDING EXP#3W.ELE.BOTH COURTYD.UNLESS EMERGENCY SITUATION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 15, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.DURING INSPECTION OBSERVED DAMAGED/OPEN MORTAR JOINTS,STEP-CRACKED BRICKWORK SPALLING STONE SPALLED BRICKS,AND VERTICAL NORTH ELEVATION.REMEDY: REPAIR/REPLACE DAMAGED FACADE |
| May 12, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE BUILDING EXTERIOR MASONRY FACADE WALL AT EXP#1,2,3&4.OBSERVED VERTICAL CRACKS WITH OPEN MORTAR JOINT AND SPALLING BRICK AT THE SEVERAL LOCATIONS AND ALSO OBSERVED.AT FIRE ESCAPES LOOSE STEP/TREAD/AND LOOSE RAILING.REMEDY:IMMEDIATELY REPAIR UNSAFE CONDITIONS/PROVIDE SAFETY MEASURES@EXP#2,3&4 |
| May 9, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING FACADE AND APPURTENANCES QEWI STATED ON FISP (UNSAFE) REPORT SUBMITTED ON 4/21/23,HAZARDOUS AND UNSAFE CONDITI ONS OBSERVED AT FIRE-ESCAPES (LOOSE STEP/TREAD,LOOSE ANCHORAGE,LOOSE RAILINGS,LOOSE CONNECTION)AND OBSTRUCTIONS ON FIRE-ESCAPE LANDINGS REMEDY:IMMED.REPAIR UNSAFE COND.&FIRE ESCAPE OPERABLE&SAFE FOR USE |
| May 4, 2023 | V-DOB VIOLATION - ACTIVE | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | CYCLE 9C UNSAFE REPORT FILED |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Mar 24, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.DURING O INSPECTION OBSERVED ON EXPSURE#1 NUMEROUS VERTICAL CRACKS MISSING MORTAR JOINTS AND CHIPPED OR CRACKED BRICKS.EXPOSURE 4 HAS NUMEROUS SPALLED BRICKS AND MISSING MORTAR JOINTS.REMEDY:REPAIR AND/REPLACE |
| Nov 16, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM EXTERIOR BLDG FACADE AND APPURTENANCES. MULTIPLE DETERIORATED/OPEN MORTAR JOINTS, VERTICLE CRACKS, SPALLED BRICKS, AND STEP CRACKING OBSERVED ON EXP1 EAST ELEV AND EXP4 NORTH ELEV. REMEDY: MAINTAIN EXTERIOR BLDG FACADE. REPAIR DAMAGED FACADE AS PER 1RCNY 103-04 |
| Jun 2, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG EXTERIOR WALLS FACADE APPURTENANCES. VIEW OF FACADE MULTIPLE DEFECTED CONDITIONS, CRACK/STEP CRACKS, SPALLING BRICKS AND ERODED MORTAR JOINTS AT VARIOUS LOCATIONS. REMEDY: MAINTAIN BUILDING EXTERIOR WALLS FACADE AND REPAIR DEFECT AS PER 1RCNY 103-04 |
| Aug 6, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONERS ORDER #031820CLL0801JC AS OF 08/06/21 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDER |
| Apr 29, 2021 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Apr 12, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 2, 2020 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Mar 18, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCE REMEDY: MAINTAIN EXTERIOR BLDG FACADE PROVIDE DAFETY MEASURES, REPAIR DAMAGE FACADE AS PER 1RCNY 103-04 |
| Jan 17, 2020 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Apr 30, 2019 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 |
| Apr 12, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Apr 19, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Apr 15, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 18, 2015 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 26, 2014 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 31, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 |
| Jul 26, 2013 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Mar 21, 2013 | V-DOB VIOLATION - ACTIVE | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | UNSAFE LOCAL LAW 11/98 REPORT FILED |
| Mar 21, 2013 | V-DOB VIOLATION - ACTIVE | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | UNSAFE LOCAL LAW 11/98 REPORT FILED |
| Mar 1, 2013 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Feb 18, 2012 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 1, 2012 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Dec 13, 2011 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Mar 14, 2011 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |