DOB violations

Department of Buildings violations attached to this BIN or tax lot.

9 records

Date Status Type Summary
Jul 30, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: OBSERVED THE FOLLOWING CONDITIONS. AT EXPOSURE 4 CRACKS, MISSING BRICKS, SPALLED/ SPALLING AND DAMED JOINTS. REMEDY: REPAIR AND/OR REPLACE
Oct 17, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED STEP CRACKING SPALLING BRICK/ STONE WORK, AND DAMAGED MORTAR JOINTS ON EXPOSURE 4. REMEDY:REPAIR AND OR REPLACE
Jan 8, 2025 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 8, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM-BLDG IN EXTRME STATE DISRPR.SPALLNG CONCRT&CORRDED REBAR@MULTI LOCTN THROUGHOUT STRCTR.OPN JOIST,CRCKS&LOOSE BRCKS OBSVD @EXP4MULTI LOCTN @EXP1&3ENDS &AT EXP1 PARAPT.OPN JOINTS OBSVD @EXP3 WALL NYSPE IMMED EVALU BLDG& DSGN RPRS.FILE PRMTS BY 4/29/22.OBTN PRMT& STRT WRK BY5/15/22.COMPLT RPR&SIGN OFF PRMTS BY11/21/22
Mar 8, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EWO-EXP4 BRCK PARAPT PARTLY COLLPSD NEAR EXP1/4 CORNR& FELLONTO PUBLIC STAIRWAY ON W 229 ST. ON 3/8/22.REMAINING PARAPET @EXP4UNSTABLE& LEANING OUTWARD.APPRX 5'RMAINING PARPT @EXP1/4 IN DISREPAIR IMMED DEMO PARAPT @EXP1/4 CORNR DOWN TO ROOF STRCTR LVL & INSTAL TB FENCE.FILE PRMT W/IN 2DAYS.STRT WRK BY3/10/22
Mar 8, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EWO-EXP4 BRCK PARAPT PARTLY COLLPSD NEAR EXP1/4 CORNR &FELLONTO PUBLIC STAIRWAY ON W 229 ST. ON 3/8/22.RMAINING BRCK PARAPT @EXP4UNSTABLE &LEANING OUTWARD.LOOSE SPALLNG CONCRT@EDGE COLUMN&BEAMS @EXP4 IMMED INSTAL TB FENCE@EXP1&4,AND SWS @EXP4.STRT WRK BY3/8/22 PE DIRECT LOCATIONS PUBLIC PROTCTN.FILE PERRMIT W/IN 2DAYS
Mar 8, 2022 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT AND INSTALL APPROXIMATELY 90 LINEAR FEET OF TIGHT BOARD CONSTRUC TION FENCC ALONG THE FRONT EXPOSURE (1) ON KINGSBRIDGE TERRACE AND APPROXIMATELY 125 LINEAR FEET OF TIGHT BOARD CONSTRUCTION FENCE AT THE RIGHT SIDE EXPOSURE (4) OF THE PARKING LOT ALONG THE PUBLIC STAIRS TO SAFEGUARD THE PUBLIC AND PROPERTY
Mar 22, 2001 V*-DOB VIOLATION - DISMISSED UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
Sep 25, 1990 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL