Bronx Bedford Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 9, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: SEAL ROOF AND ALL FIRE DAMAGED ACCESSIBLE OPENINGS TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Apr 9, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FIRE DMG TO FL5 AND ROOF FRAMING @APTS 503,504,505. DMG TO AREA UNDER SOLAR PANELS, HOLE IN ROOF W/WATER DMG. FACADE CRACKS OVER EXP2 REMEDY: OWNER TO HIRE NYSPE TO SUBMIT A REPORT W/PLANS, PHOTOS, AND RE PAIR TIMELINE TO ERTINSPECTION@BUILDINGS.NYC.GOV W/IN 14 DAYS |
| Apr 9, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BUILDING NO LONGER CODE COMPLIANT DUE TO FIRE ON 5TH FLOOR THAT WENT UP TO ROOF LEVEL, STRUCTURAL DAMAGE TO WOOD FRAMING OF WALLS AND ROOF OF BUILDING OPEN WITH LARGE HOLES UNDER SOLAR PANELS, FIRE DAMAGE & WATER, SMOKE ROOF OPEN AND VACATE DONE FOR APT LINES 5,4,3 |
| May 1, 2014 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 9, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |