Bronx Bedford Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 26, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER#348267(050925PI20701HZ)DATED 05-09-25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF 06-26-25 THERE ARE NO JOBS FILED IN BIS OR DOBNOW TO REPAIR BLDG. IMMED COMPLY W/COMMISSIONER'S ORDER#348267(050925PI20701HZ)TO REPAIR THE BLDG UNDER PERMIT |
| May 9, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN CODE COMPLIANT MANNER.OBSRVD BRICK MORTAR JOINTS DETERIORATED WIDENED&INSUFFIENT @EXP1.VARIOUS STUCCO CRACKS AND MISSNG IN SOME AREAS OF EXP2 & EXPOSED BRICK TO ELEMENTS.OWNER TO IMMED RETAIN NYSPE TO EVAL THE ENTIRE BLDG TO DETERMINE THE STRUCT STAB AND PREPARE/DWGS |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Feb 24, 2017 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |