Bronx Bedford Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 22, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.DUE TO FIRE ON 11/21/23 THE HIP ROOF PARTLLY CLLPSD.THE GABLE WALL PRTLLY NOT BRACED.DEBIRS THROUGHOUT THE BLDG &LOT.IMMED INSTALL BRACNG/TEMP SHORNG@GABLE WALL@EXP3 UNDER DRCT &CONTINUOUS SPRVSN OF PE.FILE W/IN 48 HRS OF START |
| Nov 22, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM.ON 11/21/23 BLDG SUSTAIND DAMAGE DUE TO FIRE.ROOF PRTLLY CLLPSD REAR CHARRED ROOF FRAMING CLLPSD CEILNG FINISHES ANDWATER DAMAGE THROUGHOUT.OWNR TO ENGAGE PE AND CONTRACTOR TO EVAL ENTIRE BLDG AND REPAIR UNDER PERMIT FILE BY 1/01/24 COMPLTE 3/1/24 |
| Nov 21, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT DUE TO EXTENSIVE FIRE, SMOKE AND WATER DAMAGE THROUGHOUT STRUCTURE ALONG WITH MISSING ROOF AT EAR OF PREMISES |
| Sep 29, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 29, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 29, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |