| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Feb 9, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM DUE TO 4 ALARM FIRE.PREM IS 5 STRY+BSMT+PART CELLAR,WOOD JOIST& MASONRY BEARING WALL MIX USE BLDG.BLDG SUFFERED FIRE ON 1/30/18.APPROX 50% OF COCKLOFT ROOF FRAMING HAS SEVERE TO MODERATE FIRE DAMAGE AT NORTH WING&CENTER OF BLDG.REMEDY:PROV RPRS UND PERM.PULL PERM BY 05/11/18.PERM SIGNOFF NO LATER 09/14/18 |
| Feb 1, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK.DUE TO 4 ALARM FIRE ON 1/31/18 THE BLDG SUFFERED FIRE DAMAGE AT NORTH WING+CENTER OF BLDG COCKLOFT ROOF FRAMING IS SEVERE TO MODERATE FIRE DAMAGE.REMEDY:OWN IMMED ENGAGE NYS PROF ENG+CONT'R EVAL BLDG&PROV TEMP ROOF.FILE FOR PERM W/2 BUS DAYS OF COMMENCEMENT OF WORK PROV TEMP SAFETY MEASURE OR EQUIP AROUND BLDG TO PROTECT THE PUBLIC |
| Jan 31, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| May 2, 2017 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Jan 29, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |