Bronx University Heights (North)-Fordham
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 12, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: SEAL ALL FIRE DAMAGED OPENINGS TO SAFEGUARD PUBLIC AND PROPERTY AND TO PREVENT UNLAWFUL ENTRY |
| May 11, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT. AT TIME OF INSPECTION BUILDING SUSTAINED EXTENSIVE FIRE DAMAGE CONSISTING OF CHARRED WOOD JOINTS, OPEN FIRE RATED WALLS, MISSING WINDOWS, SMOKE AND WATER DAMAGE THROUGHOUT |
| May 11, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING AN ENGINEER REPORT DUE TO BUILDING SUSTAINING EXTENSIVE FIRE DAMAGE CONSISTING OF CHARRED WOOD JOINTS, OPEN FIRE RATED WALLS, MISSING WINDOWS, SMOKE AND WATER DAMAGE THROUGHOUT. AN ENGINEER'S REPORT IS REQUIRED TO CHECK STABILITY OF BUILDING AND ALL APARTMENTS FROM FIRE DAMAGES. |
| Jun 14, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |