NYC Building Report

Bronx University Heights (North)-Fordham

2489 Morris Avenue, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

14 records

Date Status Type Summary
Sep 23, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTC COMPLY W/COMMISSIONER'S ORDER CONTROL#342157 VIO#052725PI20702SB DATED 05-27-25 REQUIRING OWNER TO SUBMIT CORRECTIVE ACTION PLAN BY 30 DAYS FROM DATE OF INSP START BLDG REPAIRS UNDER PERMIT BY 7/27/25 IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#342157 & VIO# 052725PI20702SB TO PROVIDE A CORRECTIVE ACTION PLAN
May 27, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL CORRECTION ACTION PLAN REQ'D. OBSVD @ EXP1 MASONRY CRACKS/SPALLING @ MULTIPLE LOCATIONS. OBSVD @ EXP2 CRACKED GLASS WINDOW @ 2FL @ EXP2/3 OBSVD MASONRY BULGING @ THE PARAPET LEVEL. @ THE INTERIOR COURTYARD OBSVD A CRACKED WINDOW ON 2FL. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & TO SUMBIT CORRECTIVE ACTION PLAN WITHIN 30 DAYS
May 27, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER REQ'D. OBSVD @ EXP3 INTERIOR COURTYARD, HAZ COND SUCH AS DETERIORATED MORTAR JOINTS, CRACKED/SPALLING MASONRY @ PARAPET LEVEL & A CRACKED GLASS WINDOW ON 2FL. IMMED PROVIDE SAFETY MEASURES TO SECURE/PROTECT PUBLIC @ EXP3 INTERIOR COUTYARD WHICH IS THE TENANTS MAIN EGRESS PATH:INSTALL S/W SHED APPROX 90 LINEAR FT
May 27, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMEGENCY WORK ORDER REQ'D. OBSVD
Dec 1, 2021 V-DOB VIOLATION - ACTIVE EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
May 15, 2014 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Jan 6, 2006 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 31, 2005 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 13, 2004 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 19, 2003 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 26, 2002 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 7, 2000 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED