Bronx Westchester Square
2465 Westchester Avenue, Bronx
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Apr 22, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER.BLDG IS WAREHOUSE TYPE STRUCTURE WITH W/BOWSTRING TRUSS-ROOF.DEPARTMENT SERVED A CURABLE COMMISSIONER'S ORDER ON 1/30/15 TO PROVIDE AN ENGINEER REPORT ON YOUR BUILDING.NO ENGINEER'S REPORT HAS BEEN RECEIVED. COMPLY PER THE COMMISSIONER'S ORDER |
| Jan 30, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | 1STORY OCCUPIED RETAIL STRUCTURE WITH WOOD BOWSTRING TRUSS ROOF.OWNER TO ENGAGE NYS LICENSED PE EXPERIENCED WITH WOOD TRUSSES TO PROBE AND EVALUATE STRUCTURAL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATION, PROBES ETC.REPAIR DWGS TO BE FILED WITH DOB WITH 45 DAYS AFTER THE INSPECTION. EACH TRUSS & BEARING TO BE EVALUATED |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 31, 2005 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 13, 2004 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |