NYC Building Report

Bronx Fordham Heights

2440 Walton Avenue, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

4 records

Date Status Type Summary
Oct 2, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OBSERVED AT BASEMENT APARTMENT KITCHEN OPEN HOLES IN FLOORING AND EXPOSED JOISTS , STRUCTURE INTEGRITY IN QUESTION.
Apr 14, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 8, 2019 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Jul 31, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FTM BLDG.REAR PARAPET WALL AT ROOF LEVEL LEAN TOWARDS REAR YARD OF THE PREM&STARTED TO GET DETACH FROM SIDE PARAPET WALL. FRONT PARAPET WALL START TO BULGE OUT.2ND MEAN EGRESS OF BLDG COMP.REMEDY:OWN IMMED PROV 2 FIREGUARD AT PREM.PARAPETS&FIRE ESCAPE RPR JOB BE PERM NO LATER 8/15/18.SIGN OFF OF JOB NO LATER 9/4/18