Bronx Fordham Heights
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 2, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED AT BASEMENT APARTMENT KITCHEN OPEN HOLES IN FLOORING AND EXPOSED JOISTS , STRUCTURE INTEGRITY IN QUESTION. |
| Apr 14, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Jul 31, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG.REAR PARAPET WALL AT ROOF LEVEL LEAN TOWARDS REAR YARD OF THE PREM&STARTED TO GET DETACH FROM SIDE PARAPET WALL. FRONT PARAPET WALL START TO BULGE OUT.2ND MEAN EGRESS OF BLDG COMP.REMEDY:OWN IMMED PROV 2 FIREGUARD AT PREM.PARAPETS&FIRE ESCAPE RPR JOB BE PERM NO LATER 8/15/18.SIGN OFF OF JOB NO LATER 9/4/18 |