Bronx Fordham Heights
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.ROOF IN DISREPAIR W/SGNS OF WATER DMGE THROUGHOUT, ROTTD WOOD DECLINING C MULT LOCATIONS,1.ROTTD ROOF JOISTS MIN&NEW WALL @2NDSTORY.RUSTNG EXPOSD GIRDR BEAM ENDS VISIBLE@CENTER.1.NYSPE STRCRTL ENGNEER TO EVAL ENT BLDG&DSGN RPAIRS BY 8/26/24,4.OBTN PRMTS& STRT WRK BY 9/9/24 |
| Jun 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.AT 2NDFL WINDOW OPENING OVER GROUNDFL GARAGE ENTRANCE, THE SINGLE WYTHE BRICK PIER PRTLLY SUPPORTNG STONE ARCH IS BULGD OUTWRD W/CRCKS. IMMED INSTLL TEMP SHORNG&RMVE&REPLACE BRCK PIER WYTHE C BULGE IN KIND W/LATERAL TIES PER PE.ALL WRK TO BE SPRVSD |
| May 3, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT THE ACTIVE PARKING GARAGE CONCRETE STRUCTURE, OBSERVED IN THE STATE OF DISREPAIR WITH VERTICAL CRACKS IN THE WALL AND AT THE LOAD BEARING CONCRETE BEAMS, SPALLING CONCRETE AND EXPOSED STEEL REINFORCEMENT OBSERVED DURING MY INSPECTION THROUGHOUT THE FIRST FLOOR AND SECOND FLOOR. |
| Apr 26, 1991 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Apr 26, 1991 | VP-VIOLATION UNSERVED ECB-ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |