Bronx Bedford Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.EXPOSURE 2 REAR HAD FULL DEPTH CRACK IN BEARNG WALL FULL HEIGHT FROM CELLAR TO ROOF.CELLAR EXP2 FDN WALL ON SEPARATD W/BRCK PIER&FUBBLE FDN HAS VERT CRCK BTWN.SPFCLLY EXIST FDN IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER3341667 (090924FEU20701PN) DATED SEPTEMBER 9, 2024 |
| Sep 9, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.EXPOSURE 2 REAR HAD FULL DEPTH CRACK IN BEARNG WALL FULL HEIGHT FROM CELLAR TO ROOF.CELLAR EXP2 FDN WALL ON SEPARATD W/BRCK PIER&FUBBLE FDN HAS VERT CRCK BTWN.SPFCLLY EXIST FDN.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&PREPARE&FILE RPAIR DWGS W/DOB STRT WRK UNDR PRMT BY 10/28/24&CMPLT/SGN OFF JOB 12/6 |
| Aug 20, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THERE IS A CRACK FROM THE COPING STONE DOWN WITH SEPARATION AND MISSING MORTAR SECTIONS. NOTED IN OATH SUMMONS #35668125L. |
| Jul 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE 2, LARGE VERTICAL CRACK. CRACK AT 1ST FLOOR APPROXIMATELY 3" IN WIDTH, AS YOU GO UP THE WALL CRACK APPEARS IN DIFFERENT SIZES RUNNING TO TOP OF WALL. |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |