Bronx Fordham Heights
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 15, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-OBSVD SEVERAL MASONRY CRACKS, MULT CRACK WINDOW SILLS, SAGGING WINDOW LINTELS, BULGING MASONRY AT 1FL ABOVE SIDE DOOR ENTRANCE. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING WITH DOB & NYS TO EVAL THE ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 11/05/2026 |
| Oct 15, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD SEVERAL AREAS OF SPALLING/ CRACKED BRICK MASONRY AT THE PARAPETS OF EXP2/3/4. A SEVERE CRACK AT INTERIOR OF PARAPET WAS OBSVD AT EXP1 NEAR 1/4 CORNER. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY IN 2024 SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 |
| Jun 9, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |