NYC Building Report

Bronx Westchester Square

2319 Glebe Avenue, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

11 records

Date Status Type Summary
Feb 17, 2026 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL PROVIDE APPROXIMATELY 22 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO#1 OF THE SUBJECT PROPERTY. PROVIDE A 10 LINEAR FOOT RETURN @ EXPO #1&2 TO FULLY ENCLOSE AND SAFEGUARD THE PUBLIC FROM FALLING DEBRIS HAZARD
Feb 17, 2026 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL PROVIDE APPROXIMATELY 22 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO #1 NO RETURN REQUIRED, AS THE FENCE WILL ALIGN CONTINUOUSLY WITH THE FENCES BEING INSTALLED AT 2317 AND 2321 GLEBE AVE
Feb 14, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER DUE TO THE CONCRETE STUCCO FROM THE BOTTOM OF THE 3RD FLOOR BALCONY DISLODGING AND COLLAPSING ONTO THE SECOND FLOOR BALCONY
Feb 14, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED MULTIPLE CRACKS ON THE BOOTOM SECTION OF THE BALCONIES AT THE 2ND AND 3RD LEVEL OF STRUCTURE AT EXPOSURE 1
Nov 10, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL REQUESTING AN ENGINEER REPORT DUE TO BALCONY'S BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED.
Nov 10, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL REQUESTING AN ENGINEER REPORT DUE TO BALCONY'S BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED.
May 25, 2010 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK W/OUT PERMIT
May 26, 2009 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. NO BEAMS OR LALLY COLUMNS INSTALLED. NO METAL FLOOR JOISTS AS PER BUILDING SECTION . NO JOIST. 2X12 OFFSET FOR FLOOR RITCH DESIGN NOT SHOWN ON PLANS REMEDY: STOP ALL WORK. AMEND PLANS AND PROVIDE A/E REPORT OF STRUCTURA
May 20, 2009 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ED AMENDMENTS THE PLANS SHOW METAL C JOISTS WOOD 2"X12" JOISTS WERE IN STALLED AND NO JOIST ANCHORAGE INSTALLED OR INDICATED ON PLANS 2009989 338NB REMEDY: STOP ALL WORK! SHOW ALL REQUIRED DETAILS & CHANGES CONFO RM TO AMENDMENTS CALL 212 442-1838
May 20, 2009 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS THE SCAFFOLDING IS NOT INSTALLED AS PER DOB REQUIREMENTS IN ADEQUATE OR MISSING GUARDRAILS AND FENCE, NO ACCESS TO THE CELLAR & RO OF REMEDY: SAFEGUARD PUBLICE & PROPERTY INSTALL SCAFFOLDING GUARDRAILS FENCE ACCESS TO CELLAR AS PER DOB REQUIREMENTS CALL 212 442-1544
Oct 10, 2006 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL