Bronx Westchester Square
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
11 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 17, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE APPROXIMATELY 22 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO#1 OF THE SUBJECT PROPERTY. PROVIDE A 10 LINEAR FOOT RETURN @ EXPO #1&2 TO FULLY ENCLOSE AND SAFEGUARD THE PUBLIC FROM FALLING DEBRIS HAZARD |
| Feb 17, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE APPROXIMATELY 22 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO #1 NO RETURN REQUIRED, AS THE FENCE WILL ALIGN CONTINUOUSLY WITH THE FENCES BEING INSTALLED AT 2317 AND 2321 GLEBE AVE |
| Feb 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER DUE TO THE CONCRETE STUCCO FROM THE BOTTOM OF THE 3RD FLOOR BALCONY DISLODGING AND COLLAPSING ONTO THE SECOND FLOOR BALCONY |
| Feb 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED MULTIPLE CRACKS ON THE BOOTOM SECTION OF THE BALCONIES AT THE 2ND AND 3RD LEVEL OF STRUCTURE AT EXPOSURE 1 |
| Nov 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING AN ENGINEER REPORT DUE TO BALCONY'S BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED. |
| Nov 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING AN ENGINEER REPORT DUE TO BALCONY'S BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED. |
| May 25, 2010 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK W/OUT PERMIT |
| May 26, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. NO BEAMS OR LALLY COLUMNS INSTALLED. NO METAL FLOOR JOISTS AS PER BUILDING SECTION . NO JOIST. 2X12 OFFSET FOR FLOOR RITCH DESIGN NOT SHOWN ON PLANS REMEDY: STOP ALL WORK. AMEND PLANS AND PROVIDE A/E REPORT OF STRUCTURA |
| May 20, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ED AMENDMENTS THE PLANS SHOW METAL C JOISTS WOOD 2"X12" JOISTS WERE IN STALLED AND NO JOIST ANCHORAGE INSTALLED OR INDICATED ON PLANS 2009989 338NB REMEDY: STOP ALL WORK! SHOW ALL REQUIRED DETAILS & CHANGES CONFO RM TO AMENDMENTS CALL 212 442-1838 |
| May 20, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS THE SCAFFOLDING IS NOT INSTALLED AS PER DOB REQUIREMENTS IN ADEQUATE OR MISSING GUARDRAILS AND FENCE, NO ACCESS TO THE CELLAR & RO OF REMEDY: SAFEGUARD PUBLICE & PROPERTY INSTALL SCAFFOLDING GUARDRAILS FENCE ACCESS TO CELLAR AS PER DOB REQUIREMENTS CALL 212 442-1544 |
| Oct 10, 2006 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |