Bronx Westchester Square
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
10 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 17, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE APPROXIMATELY 22 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO#1 OF THE SUBJECT PROPERTY. PROVIDE A 10 LINEAR FOOT RETURN @ EXPO #1&2 TO FULLY ENCLOSE AND SAFEGUARD THE PUBLIC FROM FALLING DEBRIS HAZARD |
| Feb 17, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE APPROXIMATELY 22 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO #1 NO RETURN REQUIRED, AS THE FENCE WILL ALIGN CONTINUOUSLY WITH THE FENCES BEING INSTALLED AT 2317 AND 2321 GLEBE AVE |
| Feb 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER DUE TO THE CONCRETE STUCCO FROM THE BOTTOM OF THE 3RD FLOOR BALCONY DISLODGING AND COLLAPSING ONTO THE SECOND FLOOR BALCONY |
| Feb 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED MULTIPLE CRACKS ON THE BOOTOM SECTION OF THE BALCONIES AT THE 2ND AND 3RD LEVEL OF STRUCTURE AT EXPOSURE 1 |
| Nov 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING AN ENGINEER REPORT DUE TO BALCONY'S BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED. |
| Nov 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING AN ENGINEER REPORT DUE TO BALCONY'S BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED. |
| May 25, 2010 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK W/OUT PERMIT' |
| May 26, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. NO STEEL BEA MS/LALLY COLUMNS INSTALLED, NO METAL FLOOR JOIST AS PER BUILDING SECTI ONS. NO JUST ANCHORAGE AS SHOWN IN ANCHORAGE DETAILS. 2X12'S OFFSET FO R ROOF PITCH DESIGN NOT SHOWN ON PLANS REMEDY: STOP ALL WORK. AMEND PLANS TO INCORPORATE ALL A/E APPROVED |
| May 20, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK SOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ED AMENDMENTS THE PLANS SHOW METAL C JOISTS WOOD 2X12 WERE INSTALLED A ND NO JOIST ANCHERAGE INSTALLED OR INDICATED ON THE PLANS 200998126NB REMEDY: STOP ALL WORK! SHOW ALL REQUIRED DETAILS & CHANGES & CONFORM T O AMENDMENTS CALL |
| May 20, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OP ERATIONS THERE IS NO PROTECTION FOR ADJOINING PROPERTY NO ACCESS TO CE LLAR AND EXCESSIVE WATER UNSAFE SCAFFOLDING, NO GUARDRAILS & HAND RAIL S THROUGHOUT 200998126NB REMEDY: SAFEGUARD PUBLIC & PROPERTY INSTALL S CAFFOLDING PROTECTION GUARDRAILS PROVIDE ACCESS TO CELLAR REMOVE WATER |