NYC Building Report

Bronx Belmont

2306 Rear Prospect Avenue, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Jan 31, 2023 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL A TIGHT BOARD FENCE ALONG EXPOSURE#1(PROSPECT AVENUE ) APPROXI MATELY 20.0 LF WITH A 5.0' RETURNS ON EXPOSURES #2 ANS #4
Jul 23, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:VACANT RESIDENTIAL BUILDING IN STATE OF DISREPAIR THE ROOF AT REAR HAS COLLAPSED.THE REAR WALL HAS PARTLY COLLAPSED.THE PORCH ROOF AT FRONT IS SAGGING.THERE IS POTENTIAL OF FURTHER COLLAPSE RENDERING THE BUILDING UNSAFE TO ENTER.IMMEDIATELY VACATE ENTIRE PREMISE UNTIL CONDITIONS ABOVE ARE MADE SAFE UNDER PERMIT
Jul 23, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:2 STRY+B DETACHD WOOD FRAME RESID BLDG IN STATE OF DISREPR.FIRE DAMAGE NOTED AT REAR WALL.MISSING WINDOWS ARE SEALED WITH PLYWOOD THAT IS WARPING.MISSING SIDING AT PARAPET EAST.DETERIORATED ROOFING.OWNER TO ENGAGE NYS PE AND CONTRACTOR TO REPAIR THE BUILDING UNDER PERMIT.FILE FOR PERMIT BY 09/01/2021.START WORK BY 09/15/2021
Jul 23, 2021 V%-DOB VIOLATION UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
Jun 4, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:VACANT RESIDENTIAL BLDG.THE STRUCT IS IN STATE OF DISRPR.REAR WALL+ROOF PARTLY COLLAPSED.ROOF IN STATE OF DISRPR.SIDING IS BULGING.FRONT PORCH COLUMNS LEANING.CORNICE IN STATE OF DISREPAIR OWNER TO ENGAGE NYSPE AND CONTRACTOR TO EVALUATE AND REPR OR DEMO BLDG UNDER PERMIT.FILE FOR PERMIT BY 09/01/2021.START WORK BY 09/15/2021
Oct 9, 2013 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jul 31, 2013 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 24, 2013 V-DOB VIOLATION - ACTIVE UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE