Bronx Concourse-Concourse Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 30, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 8, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:5ST+B+C MASONRY WALLS WITH STEEL BEAMS AND WOOD JOIST.SUSTAINED STRUCTURAL DAMAGE DUE TO FIRE.2ND FLOOR PARTIALLY COLLAPSED.MODERATE TO SEVERE DAMAGE BY EXP2,OPEN ROOF.WATER DAMAGE AND COLLAPSED CEILING IN VARIOUS LOCATIONS.OWNR TO ENGAGE NYS LIC PE&CONTRACTOR TO EVALUATE THE BLDG AND REPAIR UNDER PERMIT.FILE BY 9/3/19. START BY 9/16/19 |
| Aug 6, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK:BLDG SUSTAINED STRCTL DMG ON 8/4/19.DUE TO FIRE 2ND FLR PART COLLAP@REAR,SEVERE DMG TO WOOD JOIST@2ND FLR BY EXP2.OPEN ROOF WATER DMG&COLLAP CEILING@VARIOUS LOCAT.OWNER IMMED INSTL TEMP SHOR@2FL.CLEAN DEBRIS FROM PUBL AREAS.SEAL BUILDING.REMOVE CANOPY@SHERMAN AVE.ALL WRK DONE UNDER DIRECT&CONTIN DIRECTION&SUPV OF PE.FILE FOR PRMT BY 8/10/19 |
| Aug 5, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Feb 13, 2004 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |