Bronx Fordham Heights
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 23, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | SCHOOL W/A WOOD BOWSTRING TRUSS ROOF. REMEDY: W/IN 60 DAYS OF DATE OF VIO OWNER TO ENGAGE A NYS LIC PE EXP'D W/WOOD TRUSSES TO PROBE & EVAL STRUCTUAL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATIONS CALCULATION PROBES ETC AND SUBMIT A REPORT ACCEPTABLE TO THE DEPT REPAIR DRAWINGS TO BE FILED W/THE DOB WITHIN 45 DAYS AFTER THE INSPECTION |
| Jul 31, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO COMPLY WITH COMMISSIONER'S ORDER. THIS BUILDING HAS A WOOD BOWSTRING TRUSS ROOF. THE DOB SERVED YOU A CURABLE COMMISSIONER'S ORDER (NOTICE OF VIOLATION) TO PRODUCE AN ENGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECEIVED. COMPLY WITH THE COMMISSIONER'S ORDER |
| Apr 17, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL TESTS FOR BOWSTRING ROOF TRUSS DATING FROM EARLY 1900'S OWNER TO PROVIDE NYC DOB FEU WITH AN ENGINEERING EVALUATION OF ROOF TRUSSES USING FIELD VERIFICATIONS, CALCULATIONS, PROBES@EA.TRUSS & BEARING TO BE EVALUATED |
| Apr 17, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL TESTS FOR EARLY 1900'S BOWSTRING ROOF TRUSS |