Bronx Castle Hill-Unionport
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 11, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER; NOTE ON 01/08/2008 THERE WAS A FULL STOP WORK ORDER ISSUED FOR JOB #201103073. AT TIME OF INSPECTION OBSERVED COMPLETED WORK THAT WAS NOT ON DRAWING OR SCHEDULE A FOR JOB APPLICATION. NOTED ON SECOND FLOOR COMPLETE KITCHEN, AT CELLAR WASHER AND DRYER, LAVATORY SINK. |
| Jul 11, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT; NOTED AT SECOND FLOOR FRONT CLOSE OPENING TO BELOW AND INSTALLED KITCHEN WITH ELECTRICAL LINES FOR LIGHTS SWITCHES AND OUTLETS, INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK, INSTALLED GAS LINE FOR STOVE. NOTED AT CELLAR INSTALLED WATER AND WASTE LINES FOR SINK IN BATHROOM, AND WASHER. INSTALLED GAS LINE FOR |
| Jan 9, 2008 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |