Bronx Tremont
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 22, 2026 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| May 22, 2026 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | FAILURE TO MAINTAIN THE BUILDING IN A SAFE CONDITION REQUIRING THE OWNER TO REPAIR OR DEMOLISH BUILDING WITH PERMIT |
| Apr 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.EXPS1&4,&FRONT PORCH ROOF WERE DMGD.EXP2 HAD FIRE DMG NEAR ROOF@EXP2/3 CRNR.EXP3 WALL WAS FIRE DMGD@1ST & 2NDFL LVLS.2ND FL JOISTS MOD TO SEV FIRE DAMAGED.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&OBTAIN PRMT FOR RPAIRS.WRK TO STRT BY 7/6/26 & BE CMPLTD SGND OFF BY 8/17/26 |
| Apr 24, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: ERECT A TOTAL OF APPROX. 206 LF OF U SHAPED TIGHTBOARD CONSTRUCTION FENCE AS FOLLOWS:EXP.1 (CROTONA AVENUE)-30 FT,EXP.2 AND 4-88FT INSTALL APPROX 206 LF OF U SHAPED LIGHT BOARD FENCE TO INCLOSE POTENTIAL COLLASPE ZONE EXP1 CROTONA AVE 30LF, EXP2 AND 4 88 LF |
| Oct 8, 2014 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |