Bronx West Farms
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-03128-0027), so they can include other buildings on the same lot.
607 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Feb 10, 2022 | C | VIOLATION CLOSED | 5D | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 10, 2022 | B | VIOLATION CLOSED | 5D | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 10, 2022 | B | VIOLATION CLOSED | 5D | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 7, 2022 | B | VIOLATION CLOSED | 2D | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 5 SQ. FT AT EAST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 14821196 ISSUED 07-FEB-22 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). |
| Feb 7, 2022 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM INFORMATION PROVIDED FOR SUPER IS INADEQUATE AT PUBLIC HALL |
| Feb 7, 2022 | B | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL, CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 7, 2022 | A | VIOLATION CLOSED | 2D | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 5 SQ. FT AT EAST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 7, 2022 | B | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 7, 2022 | C | VIOLATION CLOSED | 2D | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 7, 2022 | C | VIOLATION DISMISSED | 2D | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 7, 2022 | C | VIOLATION CLOSED | 2D | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 7, 2022 | C | VIOLATION CLOSED | 2D | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 7, 2022 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR. MOBILE BOILER SYSTEM AT BLDG FRONT ALSO LOCKED. 2ND STY WEST 2 APT 2D CHECKED AT PUBLIC HALL |
| Jan 26, 2022 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM |
| Jan 26, 2022 | C | VIOLATION CLOSED | 1B | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 26, 2022 | C | VIOLATION CLOSED | 5D | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ADJUST HINGES IN THE ENTRANCE LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jan 26, 2022 | A | VIOLATION CLOSED | 5D | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOORS AT CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jan 26, 2022 | B | VIOLATION CLOSED | 5D | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th PRIVATE HALLWAY LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jan 26, 2022 | B | VIOLATION CLOSED | 5D | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC LIGHT SWITCH IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jan 10, 2022 | C | VIOLATION CLOSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED, MOBILE BOILER TRUCK STATIONED AT BUILDING BUT NOT IN OPERATION. AT BOILER ROOM |
| Jan 10, 2022 | C | VIOLATION CLOSED | 2D | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jan 10, 2022 | C | VIOLATION CLOSED | 2D | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 4, 2021 | B | VIOLATION CLOSED | 1D | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL WINDOW FRAME IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 14703736 ISSUED 04-DEC-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). |
| Dec 4, 2021 | A | VIOLATION CLOSED | 1D | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WINDOW FRAME IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 4, 2021 | C | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AND ASSEMLY AT BUILDING ENTRANCE DOOR , 1st STORY |
| Dec 4, 2021 | C | VIOLATION CLOSED | 1D | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Dec 4, 2021 | A | VIOLATION CLOSED | 1D | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL WINDOW FRAME IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 15, 2021 | A | VIOLATION CLOSED | 2D | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st BATHROOM FROM NORTH, THE 5th ROOM FROM NORTH, THE 2nd ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST, THE 2nd BATHROOM FROM NORTH, THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 15, 2021 | B | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ... WINDOW LOWER SASH COUNTER BALANCE IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY |
| Nov 15, 2021 | B | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ... WINDOW LOWER SASH COUNTER BALANCE IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2D, 2nd STORY |
| Nov 15, 2021 | B | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ... WINDOW LOWER SASH COUNTER BALANCE IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2D, 2nd STORY |
| Nov 15, 2021 | B | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE .. WINDOW LOWER SASH COUNTER BALANCE IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY |
| Nov 15, 2021 | B | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ... LOWER SASH COUNTER BALANCE IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2D, 2nd STORY |
| Nov 15, 2021 | C | VIOLATION DISMISSED | 2D | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3; WG TO REPLACE = 2; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Nov 15, 2021 | A | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ... MARBLE SADDLE IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Nov 15, 2021 | B | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ... CERAMIC FLOOR TILE IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Nov 15, 2021 | A | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ... CERAMIC TILE AT SOUTH WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Nov 15, 2021 | C | VIOLATION CLOSED | 2D | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Nov 15, 2021 | B | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ... LOWER SASH GLASS PANE IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2D, 2nd STORY |
| Nov 15, 2021 | C | VIOLATION CLOSED | 2D | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Nov 8, 2021 | A | VIOLATION CLOSED | 2D | § 27-2005 ADM CODE REFIT DOOR IN THE ENTRANCE LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 8, 2021 | C | VIOLATION DISMISSED | 2D | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 8, 2021 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING PULL HANDLE COMPACT CHUTE DOOR AT PUBLIC HALL, 1st STORY |
| Nov 8, 2021 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS ALL STORIES AT PUBLIC HALL STAIRS |
| Nov 8, 2021 | C | VIOLATION CLOSED | 2D | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 8, 2021 | A | VIOLATION CLOSED | 2D | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 8, 2021 | C | VIOLATION CLOSED | 2D | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Nov 8, 2021 | C | VIOLATION CLOSED | 4B | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRANCE LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Nov 8, 2021 | A | VIOLATION CLOSED | 4C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOWS SASH AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Nov 8, 2021 | A | VIOLATION CLOSED | 4C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM NORTH LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |