Bronx Castle Hill-Unionport
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 13, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UPON INSPECTION OBSERVED ALL PLUMBING (BOILER, GAS, WATER AND DRAIN) LINES HAVE BEEN REMOVED THROUGHOUT THE ENTIRE 3-STORY/2-FAM. DWELLING BUILDING FOR THE ILLEGAL FULL GUT RENOVATION IN PROGRESS. AS PER DOB RECORDS, CURRENTLY THERE IS NO PERMITS ON FILE FOR THE SCOPE OF WORK TAKING PLACE. |
| Sep 13, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UPON INSPECTION OBSERVED ALL ELECTRICAL (LIGHT FIXTURES, OUTLETS, SWITCHES) LINES HAVE BEEN REMOVED THROUGHOUT THE ENTIRE 3-STORY/2-FAM. DWELLING BUILDING FOR THE ILLEGAL FULL GUT RENOVATION IN PROGRESS. AS PER DOB RECORDS, CURRENTLY THERE IS NO PERMITS ON FILE FOR THE SCOPE OF WORK TAKING PLACE. |
| Sep 13, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UPON INSPECTION OBSERVED A FULL GUT RENOVATION IS TAKING PLACE THROUGHOUT THE ENTIRE 3-STORY/2-FAM. DWELLING BUILDING BY REMOVING WINDOWS, NON-LOAD BARING WALLS AND REPLACING CEILING/FLOOR JOIST. AS PER DOB RECORDS, CURRENTLY THERE IS NO PERMITS ON FILE FOR THE SCOPE OF WORK TAKING PLACE. |
| Sep 14, 2022 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Jun 9, 2014 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Jun 6, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |