Bronx Mount Hope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 1, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#341486 VIO#PI20502SB DATED 07/08/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/08/25 AND START BLDG REPAIRS UNDER PERMIT BY 09/08/25&COMPL SIGN OFF BY 10/8/25 AS OF 10/1/25 THE CAP&EVIDENCE OF COMPL REPR WORK WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#341486 VIO#PI20502SB TO PROV CAP |
| Jul 8, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D. OBSVD HAZ COND@EXP2/3/4 SUCH AS SPALLING /CRACKED MASONRY SPALLING WINDOW SILLS & DETERIORATED MORTAR JOINTS @ MULT LOCATIONS. @EXP4 COURTYARD OBSVD A CRACK GLASS WINDOW ON 3FL OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV BY 8/8/2025 |
| Aug 2, 2024 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 2, 2024 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 17, 1998 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |