NYC Building Report

Bronx Mount Hope

2087 Creston Avenue, Bronx

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 2-03169-0045), so they can include other buildings on the same lot.

2083 records

Date Class Status Apartment Summary
Oct 2, 2026 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL AT PUBLIC HALL, 1st STORY
Oct 2, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND NORTH WALL AT PUBLIC HALL, 1st STORY
Sep 25, 2026 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT PUBLIC HALL, 6th STORY, SECTION ''B-G'', AT NORTH
Sep 25, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND WEST WALL AT PUBLIC HALL, 6th STORY, SECTION ''B-G'', AT NORTH
Sep 25, 2026 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, NORTH, AND WEST WALLS AT BUILDING VESTIBULE LEADING TO 1ST STORY PUBLIC HALL , 1st STORY
Sep 25, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING, NORTH, AND WEST WALLS , 1st STORY
Sep 23, 2026 B NOV SENT OUT Not available § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO PANEL AT EAST WALL , 1st STORY
Sep 8, 2026 B NOV SENT OUT Not available § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT 3RD WINDOW PANE FROM SOUTH AT EAST WALL (BUILDING FRONT) AT PUBLIC HALL, 1st STORY
Sep 8, 2026 B NOV SENT OUT 8D § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VANITY CABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 8D, 8th STORY, 4th APARTMENT FROM SOUTH AT WEST
Sep 8, 2026 C NOTICE OF ISSUANCE SENT TO TENANT 8D HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8D, 8th STORY, 4th APARTMENT FROM SOUTH AT WEST
Sep 8, 2026 A NOV SENT OUT 9D § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 9D, 9th STORY, 4th APARTMENT FROM SOUTH AT WEST
Sep 8, 2026 B NOV SENT OUT 9D § 27-2005 HMC: REFIT CLOSET DOORS IN THE PRIVATE HALLWAY LOCATED AT APT 9D, 9th STORY, 4th APARTMENT FROM SOUTH AT WEST
Sep 8, 2026 B NOV SENT OUT 9D § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT 9D, 9th STORY, 4th APARTMENT FROM SOUTH AT WEST
Sep 8, 2026 B NOV SENT OUT 9D § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 9D, 9th STORY, 4th APARTMENT FROM SOUTH AT WEST
Sep 8, 2026 B NOV SENT OUT 9D § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 9D, 9th STORY, 4th APARTMENT FROM SOUTH AT WEST
Sep 8, 2026 A NOV SENT OUT 3E § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Sep 8, 2026 B NOV SENT OUT 3E § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGIRATOR DOORS IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Sep 4, 2026 C NOV SENT OUT Not available § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DISCARDED REFRIGERATOR WITH DOORS ATTACHED AT WEST YARD AT PUBLIC HALL, 1st STORY
Sep 4, 2026 C NOV SENT OUT Not available § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM SIGNAGE MISSING AT PUBLIC HALL, 1st STORY
Sep 4, 2026 B NOV SENT OUT 10A § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH AND WEST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 10A, 10th STORY, 1st APARTMENT FROM SOUTH AT WEST
Sep 2, 2026 C NOV SENT OUT 3I § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3I, 3rd STORY
Sep 2, 2026 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 12th STORY
Sep 2, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 12th STORY
Sep 2, 2026 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL AT PUBLIC HALL, 1st STORY
Sep 2, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND NORTH WALL AT PUBLIC HALL, 1st STORY
Sep 2, 2026 B NOV SENT OUT Not available § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL AT PUBLIC HALL, 1st STORY
Sep 2, 2026 C NOV SENT OUT Not available § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT VESTIBULE DOOR , 1st STORY
Sep 2, 2026 C NOV SENT OUT Not available § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE , 1st STORY
Sep 2, 2026 C NOV SENT OUT Not available § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
Sep 2, 2026 C VIOLATION CLOSED 9E § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 9E, 9th STORY, 1st APARTMENT FROM NORTH AT EAST
Sep 2, 2026 B NOV SENT OUT 3I § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 3I, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Aug 27, 2026 B NOV SENT OUT 5F § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUZZER AND RETURN VOICE SYSTEM FROM BUILDING ENTRANCE UP TO PANEL AT WEST WALL IN THE ENTRANCE LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''B-G'', AT NORTH
Aug 27, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT HEADER AT WINDOW CASING AT PUBLIC HALL, 12th STORY
Aug 27, 2026 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WINDOW CASING AT PUBLIC HALL, 12th STORY
Aug 27, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT WINDOW CASING AT PUBLIC HALL, 12th STORY
Aug 27, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 12th STORY
Aug 27, 2026 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT PUBLIC HALL, 12th STORY
Aug 27, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND WEST WALL AT PUBLIC HALL, 12th STORY
Aug 25, 2026 A NOV SENT OUT Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 12th STORY
Aug 25, 2026 B NOV SENT OUT Not available § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 12th STORY
Aug 22, 2026 C NOTICE OF ISSUANCE SENT TO TENANT 6I HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6I, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''H-I'', AT EAST
Aug 22, 2026 B NOV SENT OUT 6I 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF FLIES IN THE ENTIRE APARTMENT LOCATED AT APT 6I, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''H-I'', AT EAST
Aug 22, 2026 B NOV SENT OUT 10C § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 10C, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''B-F'', AT NORTH
Aug 22, 2026 B NOV SENT OUT 10C § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 10C, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''B-F'', AT NORTH
Aug 22, 2026 B NOV SENT OUT 10C § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUZZER AND RETURN VOICE SYSTEM FROM BUILDING ENTRANCE UP TO PANEL AT EAST WALL IN THE FOYER LOCATED AT APT 10C, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''B-F'', AT NORTH
Aug 22, 2026 B NOV SENT OUT 10C § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 10C, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''B-F'', AT NORTH
Aug 22, 2026 B NOV SENT OUT 10C § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET COVER AT SOUTH WALL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 10C, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''B-F'', AT NORTH
Aug 22, 2026 B NOV SENT OUT 10C § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH ,SOUTH, AND WEST WALLS IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 10C, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''B-F'', AT NORTH
Aug 22, 2026 B NOV SENT OUT 10C § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH ,SOUTH, AND WEST WALLS IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 10C, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''B-F'', AT NORTH
Aug 22, 2026 B NOV SENT OUT 10C § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 10C, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''B-F'', AT NORTH