Bronx University Heights (South)-Morris Heights
1925 Andrews Avenue South, Bronx
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 6, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN DUE TO FIRE.BLDG DMGD BY A 2-ALARM FIRE@ADJ BLDG ON 1/5/26.MANSARD ROOF FRAMNG@EXP1/2(NORTH-WEST)CORNER FIRE DMGD.2 APPRX 5FTX3FT TRIANGULAR HOLES CUT IN ROOF DURNG FIREFGHTNG OPS.1 IMMED TEMP SEAL ROOF OPENINGS,2.NYSPE STRCTRL ENG OR NYSRA ARCHITECT TO IMMED EVAL ENT BLDG&DSGN RPAIRS,3.FILE FOR RPRS |
| Jun 2, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT. FIRE CAUSED EXTENSIVE DAMAGE THROUGHOUT 5 STORY M/D. WINDOWS MISSING CHARRED BEAMS CEILINGS MISSING WATER DAMAGE THROUGH OUT |
| Jun 2, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGES OBSERVED HEAVY SMOKE FIRE AND WATER DAMAGE THROUGHOUT. APARTMENTS. 1S 1N ON FIRST FLOOR 2S 2N ON SECOND FLOOR CEILINGS MISSING BEAMS BURNED WINDOWS MISSING. REMAINDER OF APARTMENTS WINDOWS MISSING AND WATER DAMAGE THROUGHOUT DUE TO FIRE |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 17, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |