Bronx Pelham Parkway-Van Nest
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 24, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG.3S+B SEMI DETACH WOODFRAMED MULT DWLG ON INT LOT DAMAGED BY FIRE ON 4/27/18.AT EXT,FIRE DAMAGED ROOF.BROKEN WINDOWS @ALL EXPOSURES ALL OPNGS SEAL W/PLYWOOD &/OR TARPS.AT INT,FIRE DAMAGED ROOF JOISTS W/ MIN TO MOD SECT LOSS @MID 3RD OF BLDG.REMEDY:OWN HIRE PE/RA EVAL BLDG& DEVEL COMP RPR PLANS.FILE PLAN BY 9/1/18.BEG BY 10/1/18.COMP BY 6/1/19 |
| Apr 27, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |