NYC Building Report

Bronx Pelham Parkway-Van Nest

1729 Unionport Road, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

9 records

Date Status Type Summary
Jun 15, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE DAMAGE. FIRE HAS CAUSED EXTENSIVE WATER AND SMOKE DAMAGE THROUGHOUT THE REAR PORTIONS OF THE 1ST AND 2ND STORIES. SECTIONS OF THE ROOF, WALLS, AND WINDOWS REMOVED, LEAVING THE STRUCTURE OPEN TO THE ELEMENTS. ADDITIONALLY, STRUCTURAL WOOD JOISTS HAVE SUSTAINED FIRE DAMAGE.
Jun 15, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL REQUESTING A STRUCTURAL REPORT DUE TO FIRE-DAMAGED STRUCTURAL WOOD JOISTS LOCATED AT THE REAR PORTION OF THE 1ST AND 2ND STORIES. THE JOISTS HAVE SUSTAINED SIGNIFICANT FIRE DAMAGE, POTENTIALLY COMPROMISING THE STRUCTURAL INTEGRITY AND STABILITY OF THE AFFECTED AREAS OF THE BUILDING.
Apr 6, 2018 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Apr 6, 2018 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Mar 26, 2002 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 26, 2002 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 26, 2002 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED