NYC Building Report

Bronx Claremont Village-Claremont (East)

1729 Fulton Avenue, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Aug 8, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN RETAINING WALL IN A SAFE CONDITION. AT THE TIME OF INSPECTION, WE NOTED THAT THE R.W. LOCATED AT THE REAR OF THE PROPERTY IS IN A STATE OF DISREPAIR AS WELL AS SIGNS OF BULGING IN SOME AREAS. REMEDY:IMMEDIATELY RETAIN A LICENSED STRUCTURAL ENGINEER PRODUCE AN ENGINEER REPOAR TO ASSESS THE CONDITIONS & STABALIZE/DEMOLI
Aug 5, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL REQUEST A ENGINEERS REPORT DUE TO EXPOSURE 3(BACK)RETAINING WALL, CRACK, HOLES AND BULGING AREAS, AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGED CONDITIONS.
Jan 31, 2005 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Sep 16, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 10, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
May 17, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED