Bronx Pelham Parkway-Van Nest
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 28, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT; NOTED AT BASEMENT ERECTED VARIOUS FULL HEIGHT PARTITIONS TO CREATE 3-PIECE BATHROOM AND 1 ROOM. WITH ADDITIONAL ELECTRICAL LINES FOR LIGHTS, SWITCHES, AND OUTLETS. INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK, AND 3-PIECE BATHROOM (TOILET, SINK, TUB). INSTALLED GAS LINE IN KITCHEN FOR STOVE. |
| Jun 28, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | RESIDENCE ALTERED; NOTED OFFICIAL BUILDING DEPARTMENT RECORDS INDICATES BUILDING AS 2 STORIES 2 FAMILY, WITH DWELLINGS ON FIRST AND SECOND FLOORS. HAS BEEN ALTERED TO 3 FAMILY, BASEMENT HAS NOW BEEN ALTERED TO A CLASS A APARTMENT WITH 3-PIECE BATHROOM, KITCHEN WITH RESIDENTIAL SINK, GAS STOVE, AND 1 BEDROOM. |