Bronx University Heights (South)-Morris Heights
1705 Andrews Avenue South, Bronx
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-02878-0169), so they can include other buildings on the same lot.
1215 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Sep 1, 2026 | B | NOV SENT OUT | 4J | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4J, 4th STORY, 5th APARTMENT FROM NORTH AT EAST |
| Sep 1, 2026 | B | NOV SENT OUT | 4J | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4J, 4th STORY, 5th APARTMENT FROM NORTH AT EAST |
| Sep 1, 2026 | C | NOTICE OF ISSUANCE SENT TO TENANT | 5K | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Sep 1, 2026 | C | NOV SENT OUT | 5J | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF DOOR SWEEP PERMANENTLY INSTALLED IN THE ENTRANCE LOCATED AT APT 5J, 5th STORY, 5th APARTMENT FROM NORTH AT EAST |
| Sep 1, 2026 | C | NOTICE OF ISSUANCE SENT TO TENANT | 5J | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY, 5th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | A | NOV SENT OUT | 1L | § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Aug 26, 2026 | C | NOTICE OF ISSUANCE SENT TO TENANT | 1J | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1J, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 2H | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 2H | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT EAST WALL IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | A | NOV SENT OUT | 2H | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 2H | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | C | NOTICE OF ISSUANCE SENT TO TENANT | 2H | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 2H | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST AND NORTH WALLS IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 2H | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 2H | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 2H | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 2M | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2M, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Aug 26, 2026 | B | NOV SENT OUT | 2M | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2M, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Aug 26, 2026 | B | NOV SENT OUT | 3E | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN THE WASTE LINE AT WASHBASIN IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | CIV14 MAILED | 3F | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | CIV14 MAILED | 3F | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 4M | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE BATHROOM LOCATED AT APT 4M, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Aug 26, 2026 | B | NOV SENT OUT | 4M | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4M, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Aug 26, 2026 | A | NOV SENT OUT | 5G | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | A | NOV SENT OUT | 5G | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | A | NOV SENT OUT | 5G | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 5F | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 5F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 5F | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | NOV SENT OUT | 6D | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, NORTH AND EAST WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Aug 26, 2026 | B | NOV SENT OUT | 6D | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Aug 26, 2026 | B | NOV SENT OUT | 6D | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Aug 26, 2026 | B | NOTICE OF ISSUANCE SENT TO TENANT | 6D | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ.FT. BUT LESS THAN 30 SQ.FT. OBSERVED AT WEST AND NORTH WALLS IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Aug 26, 2026 | B | NOV SENT OUT | 6D | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Aug 26, 2026 | B | CIV14 MAILED | 6G | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | CIV14 MAILED | 6G | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | CIV14 MAILED | 6G | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | CIV14 MAILED | 6G | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | CIV14 MAILED | 6G | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | CIV14 MAILED | 6G | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | A | NOV SENT OUT | 5C | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY , THE 1st ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST, THE FOYER LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 26, 2026 | B | CIV14 MAILED | 6G | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | B | CIV14 MAILED | 6G | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE FOYER LOCATED AT APT 6G, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Aug 26, 2026 | C | NOTICE OF ISSUANCE SENT TO TENANT | 5C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 26, 2026 | C | NOTICE OF ISSUANCE SENT TO TENANT | 5C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 25, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER CHUTE DOOR AT WEST WALL AT PUBLIC HALL, 3rd STORY |
| Aug 25, 2026 | B | NOV SENT OUT | 3F | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Aug 25, 2026 | B | NOV SENT OUT | 3F | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Aug 19, 2026 | C | INVALID CERTIFICATION | 5C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Aug 19, 2026 | B | NOV SENT OUT | 2E | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT DOOR IN THE ENTRANCE LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |