Bronx Crotona Park East
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
12 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-MASONRY WALLS AND WOOD FRAMED ROOF DETACHED VACANT BLDG IN SEVERE STATE OF DISREPAIR. ONE BOWSTRING TRUSS COLLAPSE ON 6/19. THE ROOF HAS FURTHER COLLASPED. THE REMAINDER OF THE ROOF FRAMING(BOWSTRING TRUSSES)IS IN STATE OF DISREPAIR AND THERE IS POTEN OF FURTHER COLLASPE. REMEDY:IMMED DEMO BLDG UNDER DIRECT SUERV |
| Jun 24, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMM'S ORDER#315795 07/01/19 TO FILE FOR PERMIT BY 08/01/2019 AND START WORK BY 09/01/2019-MAKE BLDG CODE COMPLIANT AS OF 06/24/2020.BLDG HAS NOT BEEN REPAIRED OR DEMOLISHED.NO JOBS FILED FOR PERMIT WITH THE DEPARTMENT.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDR # 315795 |
| Jul 29, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER:1 STRY DETACH MASN WALLS&WOOD TRUSS FRAMED ROOF (BOW STRING TRUSSES)ON 6/28/19 ONE TRUSS OF ROOF COLLAP.THE ROOF PART COLLAP APPX 50'WIDE SECTION.THE EXT WALLS ARE NOT BRACED AND THERE IS POSSIBILITY OF COLLAP.IMMED BRACE WALL ALONG WEST FARM ROAD UND DIRECT AND CONTINOUS SUPERVISION OF PE.OBTAIN PERMIT NO LATER THAN 8/15/19 |
| Jul 1, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:TRUSS ROOF,APPROX 150'W BY 110'D IN DISREP.ONE ROOF TRUSS COLLAP CAUSING A 50' WIDE SECT OF ROOF TO PART COLLAP&HANG FROM OTHERTRUSSES FRNT WALL IS PART UNBRACED.DETERIOR&CRACKED BRICKS NOTED ON ALL WALLS FULLY VACATE BLDG. OWNER ENGAGE PE EVALUATE STRUCTURE&MAKE BLDG CODE OMPLIANT UNDER PRMT. FILE FOR PRMT BY 8/1/19.START WRK BY 9/1/19 |
| Jun 28, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK ORDER: ONE ROOF TRUSS COLLAP BY EXP4 & REMAINDER OF TRUSS IS RESTING ON EXP3 WALL.ROOF SUPPORTED ON THIS TRUSS HAS PART COLLAP AREA (50'WX100'D +/-),LEAVING PERIMETER WALLS IMPROPERLY BRACED. OWNR IMMED ENGAGE PE&ENDORSED CONTR ERECT T/B/F ALONG WEST FARM ROAD TO PROTECT THE PUBLIC.WRK DONE UND CONTIN SUPV OF PE.FILE PRMT WITHIN 2 BUSS DAYS |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |