Bronx Westchester Square
1654 Castle Hill Avenue, Bronx
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 19, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM PREM IS 3S+CELL SEMI ATTACH WOOD FRAMED W/MASONRY PERIM WALLS BLDG W/1S REAR EXT ON INT LOT.FRONT WALL SEPARATING FROM SIDE WALLS.SIDE WALLS HAVE CRACKS,BULG BRICK,OPEN JOINTS,CORR STEEL LINTELS,DETERIOR MASONRY&UNFRAME OPNGS.REMEDY:OWN HIRE PE ENG'R EVAL BLDG&PROV RPRS UND PERM.OBT PERM BY 7/31/18.WRK START BY 8/15/18.PERM SIGNOFF 10/26/18 |
| Jun 15, 2018 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE L-SHAPED METAL STRAPS @EXP 1/2 & EXP 1/4 CORNER TO BRACE EXP1 WALL AT VARIOUS LEVELS & @PARAPET.ATLEAST 1STAP SHOULD BE AT PARAPET & AT ATLEAST 1 STRAP IN CLOSE PROXIMITY TO PARAPET WITH REMAINING STRAPS FROM ROOF TO 2FL MIN |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Apr 23, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |