Bronx University Heights (South)-Morris Heights
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-02866-0015), so they can include other buildings on the same lot.
2309 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Mar 13, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN IN THE BATHROOM LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 13, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT WATER CLOSET IN THE BATHROOM LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 13, 2013 | C | VIOLATION CLOSED | 5BN | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 13, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT TUB IN THE BATHROOM LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 13, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT 1st CLOSET FROM EAST AT SOUTH WALL WALL, 1st CLOSET FROM EAST AT SOUTH WALL CEILING, CEILING IN THE FOYER LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 13, 2013 | C | VIOLATION CLOSED | 5BN | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK .. 1st CLOSET FROM EAST AT SOUTH WALL CEILING IN THE FOYER LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | C | VIOLATION CLOSED | 5BN | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | A | VIOLATION CLOSED | 5BN | SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE COUNTER BALANCE LOWER WINDOW SASH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | A | VIOLATION CLOSED | 5BN | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT INSIDE CLOSET WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | A | VIOLATION CLOSED | 5BN | SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... INSIDE CLOSET WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | A | VIOLATION CLOSED | 5BN | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .... IN THE BATHROOM LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE SHOWER STALL HEAD IN THE BATHROOM LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARD WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | A | VIOLATION CLOSED | 5BN | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Mar 11, 2013 | B | VIOLATION CLOSED | 5BN | SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN AT EAST WALL IN THE BATHROOM LOCATED AT APT 5BN, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Feb 14, 2013 | A | VIOLATION DISMISSED | 4BS | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONRETE FLOOR AND CERAMIC FLOOR TILE AT ENTRANCE ; LOCATED AT APT 4BS, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 14, 2013 | A | VIOLATION CLOSED | 4BS | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE UNLEVEL WOODEN FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4BS, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Feb 14, 2013 | A | VIOLATION CLOSED | 4BS | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE SADDLE AT ENTRANCE IN THE BATHROOM LOCATED AT APT 4BS, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jan 27, 2013 | A | VIOLATION CLOSED | 1CS | SECTION 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE ERRODED PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 1CS, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 11, 2013 | C | VIOLATION CLOSED | 2CN | SECTION 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2CN, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Jan 11, 2013 | C | VIOLATION CLOSED | 2CN | SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2CN, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Jan 11, 2013 | C | VIOLATION CLOSED | Not available | SECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM AT CELLAR, BOILER ROOM DOOR LOCKED |
| Jan 11, 2013 | C | VIOLATION CLOSED | 3AN | SECTION 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3AN, 3rd STORY, SECTION AT NORTH |
| Jan 11, 2013 | C | VIOLATION CLOSED | 3AN | SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3AN, 3rd STORY, SECTION AT NORTH |
| Jan 11, 2013 | B | VIOLATION DISMISSED | 3AN | SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING AT APARTMENT NORTH LOCATED AT APT 3AN, 3rd STORY |
| Dec 10, 2012 | A | VIOLATION DISMISSED | 4AN | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST, THE 1st ROOM FROM EAST AT SOUTH, THE 1st PRIVATE HALLWAY FROM NORTH, THE KITCHEN , THE 2nd PRIVATE HALLWAY FROM NORTH, THE BATHROOM , THE FOYER LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | A | VIOLATION DISMISSED | 4AN | SECTION 27-2005 ADM CODE REFIT CLOSET DOOR AT NORTH IN THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | A | VIOLATION DISMISSED | 4AN | SECTION 27-2005 ADM CODE REFIT CLOSET DOOR AT NORTH IN THE 2nd PRIVATE HALLWAY FROM NORTH LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | C | VIOLATION CLOSED | 4AN | SECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE FOYER LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | B | VIOLATION DISMISSED | 4AN | SECTION 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRING AT SOUTH WALL IN THE FOYER LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | A | VIOLATION DISMISSED | 4AN | SECTION 27-2005 ADM CODE REFIT CLOSET DOOR AT EAST IN THE FOYER LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | A | VIOLATION DISMISSED | 4AN | SECTION 27-2005 ADM CODE REFIT DOOR AT NORTH IN THE BATHROOM LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | A | VIOLATION DISMISSED | 4AN | SECTION 27-2005 ADM CODE REFIT DOOR AT WEST IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | B | VIOLATION DISMISSED | 4AN | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | C | VIOLATION CLOSED | 4AN | SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | B | VIOLATION DISMISSED | 4AN | SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE 3rd ROOM FROM EAST LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | B | VIOLATION DISMISSED | 4AN | SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE 3rd ROOM FROM EAST LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | B | VIOLATION DISMISSED | 4AN | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, SOUTH WALL, CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | C | VIOLATION CLOSED | 4AN | SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | B | VIOLATION DISMISSED | 4AN | SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE SINK BASE CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | C | VIOLATION CLOSED | 4AN | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE IN THE KITCHEN LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 10, 2012 | B | VIOLATION DISMISSED | 4AN | SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4AN, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Dec 7, 2012 | C | VIOLATION CLOSED | 3EN | SECTION 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3EN, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Dec 7, 2012 | C | VIOLATION DISMISSED | 3EN | SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3EN, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Dec 7, 2012 | C | VIOLATION CLOSED | 2CN | SECTION 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2CN, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 7, 2012 | C | VIOLATION CLOSED | 2CN | SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2CN, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Dec 3, 2012 | B | VIOLATION DISMISSED | 3AS | SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AND MILDEW AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 3AS, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |