Bronx Pelham Parkway-Van Nest
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 10, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN-THE FRONT WALL PARAPET IS LEANING.SPALLED &CRACKED STUCCO NOTED @FRONT WALL DETERIORTD MORTAR & CRACKD BRICK NOTED@REAR, FRONT WALL DETACHING.OWNR TO ENGAGE NYSPE & CONTRACTR TO RPR BLDG UNDER PRMT.FILE FOR PERMIT BY 9/1/2023.SIGN OFF REPAIRS BY 6/1/2024 |
| Aug 10, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMRGCY WRK-AT FRONT WALL THE PARPT & WALL ABOVE MAIN ENTRANCIS BOWING& LEANING.THERE IS POTENTIAL OF WALL TO COLLAPSE.IMMED INSTLL TEMP SHORING & BRACING @FRONT WALL UNDER DIRECT &CONT SUPRV OF PE.SUBMT SKTCHS.FILE W/IN 48HRS OF WRK START |
| Jul 13, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | AT EXPOSURE#1 ERECT APPROXIMATELY 90 LINEAR FEET OF SIDEWALK SHED WITH A CATCHALL AT BOTH ENDS AND APPROXIMATELY 8 LINEAR FEET RETURN AT EXPOSURE#4 WITH A CATCHALL AT BOTH ENDS |
| Jul 12, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. I OBSERVED THE FRONT PARAPET WALL BULGING WITH MISSING BRICKS AND VERTICAL CRACKS. NOTED NUMEROUS CRACKS THROUGHOUT EXPOSURE #3, #4. NOTED BULGING AND CRACKED STUCCO AT EXPOSURE #1. NOTED A SEPARATED METAL EXHAUST PIPE AT EXPOSURE #3 |
| May 23, 2017 | V-DOB VIOLATION - ACTIVE | CLOS-PADLOCK NONE | CLOS-PADLOCK NONE |