Bronx University Heights (South)-Morris Heights
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 17, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT DUE TO CAR FIRE AT EXPOSURE #4 EXTERI OR . AT THE TIME OF INSPECTION OBSERVED MULTIPLE HAIR LINE CRACKS IN W ALLS AND CEILINGS OF APARTMENTS 3B, ALSO OBSERVED HAIRLINE CRACKS IN HALLWAY WALLS BETWEEN 1ST & 2ND FLOOR INTERIOR EXP#4 REPLACE /REPAIR IN CODE COMPLIANT MANNER |
| May 17, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER DUE TO FIRE AT EXTERIOR MASONRY WALL EXPOSURE #4 CAUSING INTERIOR CRACKS AT IN THE W ALLS OF APT 3B DUE TO HEAT ......SUBMIT ENGINEERS REPORT ADDRESSING CONDITIONS CITED TO ERTINSPECTIONS@BUILDINGS.NYC.GOV WITHIN 72 HOURS 718-286-3460 |
| May 17, 2011 | V*-DOB VIOLATION - DISMISSED | B-BOILER BOILER OPTIONAL | B-BOILER BOILER OPTIONAL |