Bronx Morris Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 12, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 12, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 12, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 12, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 12, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 18, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK:3 STORY ATTACHD MASN WALLS&WD FRAMED FLOORS RESIDENTIAL BUILDING THAT SUSTAINED DAMAGES DUE TO EXPLOSION ON 2/18/21.THE END BEARING OF THE STEEL BEAM SUPPORTING EXPOSURE #1 WALL WAS COMPROMISED IMMEDIATLY INSTALL TEMP SHORING@STEEL BEAM @2FLR @EXP1 UNDR DIRECT AND CONTINUOUS SUPERVISION OF PE.FILE FOR PERMIT WITHIN 48 HRS OF WRK STRT |
| Feb 18, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.RESID BLDG THAT SUSTAINED DAMAGE DUE TO EXPLOSION ON 02/18/2021.FRNT WALL BOWING,SEVRE DAMAGE TO FLOORS 1,2 & 3 INTERIOR WALLS.DISPLACED AND COLLAPSED PARTITON WALLS AND FLOORING.OWNER ENGAGE NYS LIC'D PE AND CONTRCT TO EVALU STRUCTURE AND PROVIDE REPORT.REPAIR BLDG UNDER PERMIT.FILE FOR PERMIT BY 4/1/21.START WORK BY 5/1/21 |
| Feb 18, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WRK:3STRY,ATTCH,MASN WALLS+WD FRME FLRS RESID BLDG SUSTAINED DAMAGES DUE TO EXPLOSION ON 2/18/21.FRONT WALL BRICK FACADE IS BOWING AND THERE IS POTENTIAL OF BRICKS FALLING.BUILDING IS OPN.OWNR TO IMMED DO:CLEAN DEBRIS FROM STREET AND SIDWLK.IMMED INSTALL TIGHT BOARD FENCE AT FRONT AT LOT LINES.FILE FOR PERMIT WITHIN 48 HOURS OF WORK START |
| Feb 18, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO EXPLOSION ENTIRE PREMISES SUFFERED DAMAGE INCLUDING BUT NOT LIMITED TO MISSING FLOOR, DISPLACED PARTITIONS AND BROKEN WINDOWS |