Bronx Mount Eden-Claremont (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
10 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 17, 2026 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | REMEDY: FULLY DEMOLISH THE MAIN 2 STORY BUILDING AND 1 STORY REAR SHED GRADE AND FENCE SITE |
| Dec 16, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NONCOMPLIANT, DAMAGE SUSTAINED DUE TO FIRE CAUSING SMOKE AND WATER DAMAGE W/CHARRING TO STRUCTURAL MEMBERS, ROOF OPEN REMEDY: SUBMIT ENG REPORT W/IN 72HRS TO ERTINSPECTIONS@BUILDINGS.NYC.G OV (718) 286-3460 |
| Dec 16, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT . DAMAGES OBSERVED TO HAVE BEEB SUSTA INED DUE TO FIRE CAUSING EXTENSIVE SMOKE & WATER DAMAGE WITH CHARRING TO STRUCTURAL MEMBERS & ROOF OPEN.....SUBMIT REPORT FOR CONDITIONS CIT ED WITHIN 72 HOURS TO ERTINSPECTIONS@BUILDINGS.NYC.GOV 718-286-3460 |
| Dec 16, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PREMISES HAS SUSTAINED EXTENSIVE SMOKE AND WATER DAMAGE THROUGHOUT THE WINDOWS AND DOORS HAVE BEEN REMOVED AND THE ROOF IS OPEN REMEDY: REPAIR THE DOOR TO THE CONSTRUCTION FENCE AT EXP# 1 AND SEAL BUILDING |
| Dec 16, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE,WATER AND SMOKE DAMAGE THROUGHOUT PREMISES. ALSO OBSERVED MISSING WINDOWS AND OPENING IN THE ROOF EXPOSING PREMISES TO THE ELEMENTS. |
| Oct 23, 2025 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | @ EXPO#1 (MORRIS AVE) REQUESTING APPRX 10 LINEAR FT OF FENCE FROM THE NORTHEAST CORNER OF THE BUILDING TO THE PUBLIC SIDEWALK, @ EXPO#1 (MORRIS AVE) REQUESTING APPRX 10 LINEAR FEET OF FENCE FROM SOUTHEAST CORNER OF THE BUILDING TO THE PUBLIC SIDEWALK @ EXPO#1 (MORRIS AVE) REQUESTING APPRX 30 LINEAR FT OF FENCE RUNNING THE LENGHT OF THE BUILD |
| Jun 13, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | W/O A PERMIT. NOTED: AT CELLAR - FULL HEIGHT PARTITION WALLS ERECTED TO SUB-DIVIDE LEVEL: TO CREATE A BTHRM & 2 BDRMS. WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM, RESIDENTIAL SINK AT KITCHEN AREA. EXPOSED GAS LINE INSTALLED. ELECTRICAL WIRING INSTALLED FOR ADDL'T LIGHTS & OUTLETS. |
| Feb 18, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | W/O A PERMIT. NOTED: AT REAR YARD/EXPOSURE 3 - GARAGE DOOR REMOVED & REPLACED WITH CMU BLOCKS, DOOR & WINDOW. |
| Feb 18, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | W/O A PERMIT. NOTED: AT CELLAR FRONT - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE A BTHRM & 3 RMS. WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM (TOILET, SINK, TUB); RESIDENTIAL SINK AT KITCHEN AREA. GAS LINE INSTALLED FOR STOVE. ELECTRICAL WIRING INSTALLED FOR LIGHTS & OUTLETS. |
| Feb 18, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | W/O A PERMIT. NOTED: AT 1ST FLR FRONT - FULL HEIGHT PARTITION WALLS ERECTED TO SUB-DIVIDE LEVEL FRONT & REAR; TO CREATE AN ADDL'T BTHRM. ADDL'T WATER & WASTE LINES INSTALLED FOR 3 PC BTHRM; RESIDENTIAL SINK AT KITCHEN AREA. GAS LINE FOR STOVE. ELECTRICAL WIRING FOR ADDL'T LIGHTS & OUTLETS. |