Bronx Soundview-Bruckner-Bronx River
1460 Westchester Avenue, Bronx
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
19 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 23, 2024 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| Dec 8, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT. NOTICED: TWO ATTACHED TO THE BUILDING ENCLOSED STRUCTURES (4FX16F AND 4FX36F) ERECTED AT EXPOSURES#1 AND 4 TO PROVIDE ADDITIONAL SITTING PLACES TO EXISTING EATING AND DRINKING ESTABLISHMENT. WORK COMPLETED 100%. |
| Dec 8, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE FOLLOWING CONDITIONS ARE TO BE RESTORED IMMEDIATELY. RESTORE PUBLIC RIGHT AWAY-SIDEWALK ALONG EXPOSURES#1 AND 4 TO PREVIOUS LEGAL CONDITIONS. REMOVE OBSTRUCTIONS. |
| Jan 17, 2020 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Mar 1, 2013 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |