Bronx Highbridge
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 25, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED CRACKED/SPALLED STONE WORK ON EXPOSURE 1. ALSO CRACKED/SPALLING STUCCO /BRICK WORK ON EXPOSURE 3 AND 4. REMEDY: REPAIR AND/OR REPLACE |
| Oct 7, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE CRACK/AND SPALLING OF DECORATIVED STONES, LENTIL CORROSIONS CRACK AND SPALLING AT EXPOSURE2, EXPOSURE 3 AND EXPOSURE 4. ROOF: AREA CRACK AT BULKHEAD. REMEDY: REPAIR AND/OR REPLACE |