Date Status Type Summary
May 29, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRCTRL PEER REVIEW.SKETCHES FOR REMEDIAL WRK TO GUARDRAILS SUBMITTED VIA EMAIL TO DOB-FEU BY NYSPE#103102 AKM S.RAHMAN ON 5/12/26,5/15/26, 5/20/26 WERE INCMPLTE,DEFICIENT,&NOT CODE COMPLIANT.1.OWNR TO PRVDE NAMES OF 3NYSPE STRCTRL ENGNRS IN GOOD STNDG W/KNOWLEGE&EXPERIENCE W/ SIMILAR STRCTR BY 6/5/26 FOR APPRVL
May 7, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION AT BUILDING SOUTH WING - EXCESSIVE WATER AND FIRE DAMAGE WAS OBSERVED TO APTS WALL & CEILING THROUGHOUT.
Jan 12, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY W/COMMISSIONER'S ORDER:DOB VIO #110325FEU20402BS (CONTROL #341625)ISSUED ON 11/3/25 REQUIRED TO IMMED INSTALLATN OF TEMP SHORNG@EXTERIOR STAIR EXP2(NORTH)SIDEYRD UNDR THE DRCT SUPERVISN& DRCTN OF ONSITE PE,WHO WAS TO SBMT DAILY RPRTS TO DOB-FEU&FILE THE EMRGNCY WRK W/IN 2 BUSINESS DAYS OF WRK STRT
Dec 22, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ADD'L INFORMATION-THE BLDG SUFFERED A 3-ALARM FIRE ON 11/3/25 & SUSTAINED STRUCT DAMAGE TO ROOF OF SOUTH WING.THE INTERNAL STAIR@NORTH WING IS IN A STATE OF EXTREME DISREPAIR.IMMEDIATELY COMPLY WITH DOB VIOLATION #110625FEU20401BS (CONTROL #350326)
Dec 22, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Nov 24, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK.BLDG SFFRD A 3-ALARM FIRE ON 11/3/25&SUSTAIND STRCTRL DMG TO ROOF LVL OF SOUTH WNG&CENTR CONNECTOR.ROOF FRAMNG,CKCLFT FRAMNG ROOF DECKNG CHARRD W/MULT LRG OPENING&AREAS OR PRTL CLLPSD RF IMMEDIATELY COMPLY WITH DOB VIOLATION #110325FEU20401BS(CONTROL # 341624)
Nov 6, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ADD'L INFORMATION-THE BLDG SUFFERED A 3-ALARM FIRE ON 11/3/25&SUSTAIND STRUCT DAMAGE TO ROOF OF SOUTH WING.THE INTERNAL STAIR @ NORTH WING IS IN A STATE OF EXTREME DISREPAIR.NYSRA TO IMMED EVAL ENTIRE BLDG&SUBMIT PROPOSED TEMP EGRESS PLAN W/CODE REF&ANY ACTION ITEMS FOR PROPOSED PART RESCIND
Nov 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.EXTERIOR EGRESS STAIR@EXP2(NORTH)SIDE YARD IN EXTREME STATE OF DISREPAIR&PORTION SHARED EGRESS W/NEIGHBORNG BLDG @ 1436 CLAY AVE FOR THEIR CELLAR.MULT LOCATIONS OF MODRTLY TO SEVERE 1.NYPSE STRCTRL ENG TO IMMED EVAL ENT BLDG EGRESS PATH@EXP2 SIDE YRD& DSGN RPAIRS,2.FILE FOR RPAIRS BY 12/8/25,3.OBTN PRMT
Nov 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.EXTERIOR WALLS&EXTERIOR SLAB IN AN EXTREME STATE OF DISREPAIR.REAR WALLS HAVE CRCKS,BULGNG BRCK,CORRODED LINTELS,& CORRODED FIRE ESCAPES IN MULT LOCATIONS THROUGHOUT REAR BLDG.1.NYSPE TO IMMED EVAL ENT BLDG EXTERIOR&DSGN RPAIRS,2.FILE FOR RPAIRS BY 1/5/25,3.OBTN PRMTS&STRT WRK BY 1/19/26
Nov 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN DUE TO FIRE.BLDG SFFRD A 3ALARM FIRE ON 11/3/25 & SUSTAIND STRCTRL DMG TO ROOF@SOUTH WING&CENTER CONNECTOR W/ROOF& COCKLOFT FRAMNG&ROOF DECKNG CHARRD THROUGHOUT TO VARYING.1.NYS PE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 12/15/25,3.OBTN PRMTS&STRT WRK BY 12/29/25
Nov 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.THE INTERIOR STAIR@NORTH WING WAS IN A STATE OF DISREPAIR.STAIR BULKHD@NORTH WING HAS ACTIVE LEAKS.NORTHSTAIR FRAMNG CORRODED W/DETACHD CARRIER ANGLES,CORRODED.1.NYSPE TO IMMED EVAL ENT NORTH STAIR&DSGN RPAIRS,2.FILE FOR RPAIRS BY 11/12/25,3.OBTN PRMTS& STRT WRK BY 11/17/25
Nov 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK.BLDG SFFRD A 3-ALARM FIRE ON 11/3/25&SUSTAIND STRCTRL DMG TO ROOF LVL OF SOUTH WING&CENTR CONNECTR.ROOF FRAMNG,CCKLFT FRAMNG &ROOF DECKNG CHARRD W/MULT LRG OPENINGS&AREAS OR PRTL CLLSD RF.1.IMMED REINSTLL TEMP ROOF@SOUTH WALL.RMVE UNSTABLE ROOF,INSTLL TEMP SHORNG& BRACNG,&INSTLL TEMP ROOFNG PER PE
Nov 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK.EXTERIOR STAIR@EXP2(NORTH)SIDE YARD IS SHARED EGRESS PATH FOR CELLAR OF 1436 CLAY AVE&REAR YARD FIRE ESCAPES OF THIS BLDG ALONG W/CELLAR.EXT STAIR&LANDNG@EXP2 SIDE YRD IN EXTREME STATE.1.IMMED INSTLL TEMP SHORNG&BRACNG PER NYSPE TO STBLIZE SHARED EGRESS PATH,2 ALL WRK TO BE PRFRMD BY DOB REG CNTRCTR
Nov 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED SEVERELY CHARRED ROOF JOIST AT 6TH FLOOR. SECTIONS OF ROOF MISSING, REMAINING SECTIONS SEVERELY SAGGING. PARAPET MASONRY WALL LEANING INWARD SECTIONS PARTIALLY DETACHED. MASONRY STAIRWELL TREADS HAVE SEVERE CRACKS SECTIONS MISSING.
Nov 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT 6TH FLOOR B-WING SEVERE FIRE, WATER & SMOKE DAMAGE ALONG WITH SEVERE CHARRING OF CEILING/ROOF JOIST. LARGE SECTIONS OF ROOF MISSING, REMAINING SECTIONS HAVE SEVERE SAGGING. MASONRY PARAPET WALL AT BOTH A/B WINGS ARE LEANING SECTIONS HAVE PARTIALLY DETACHED.
May 6, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE ORDER DUE TO THE MULTIPLE HAZARDOUS CONDITIONS SUCH AS CRACKED AND SPALLING MASONRY BRICKS AND CRACKED DETERIORATED WINDOW SI LLS AND LINTELS.THESE CONDITIONS HAVE MADE THE COURTYARDS EXP2 NORTH,3 EAST AND 4 SOUTH UNABLE TO BE OCCUPIED.REMEDY:VACATE ENTIRE COURTYARD AT EXP2 NORTH,3 EAST,AND 4 SOUTH.TO BE USED IN EMERGENCIES ONLY
May 3, 2024 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Apr 16, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL .EMERGENCY WORK ORDER DUE TO BULGING MASONRY CRACKS IN MASONRY,DETERIO -RATED LINTELS& WINDOW SILLS AT BOTH EXPOSURE#1(EAST ELEV)&#2(SO.ELE) CRACKS IN DECORATIVE STONE COURTYARD MAIN ENTRANCE,CRACKS IN PARAPET & SPALLING COPING STONE ROOF ELEV.REMEDY:IMMED.PROVIDE SAFETY MEASURES TO PROTECT PUBLIC&REPAIR DEFECTED FACADE INSTALL SIDEWALK SHED EXP#1&2
Jan 9, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 9, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 9, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 18, 2019 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 6, 2019 V-DOB VIOLATION - ACTIVE ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Jun 27, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 27, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 27, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 27, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 3, 2017 V-DOB VIOLATION - ACTIVE ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Dec 28, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 14, 2016 V-DOB VIOLATION - ACTIVE ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Sep 13, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 13, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 10, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 26, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL @ EXPOSURE #1 & #3 FACADES ALONG PARAPET & 6TH FLOOR WINDOWS VERTICLE & HORIZONTAL STEPCRACKS SPANNING FROM QUOIN TO QUOIN AS WELL PARAPET WARPED & OUT OF PLUMP
May 24, 2016 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE EGNCY-EMERGENCY NONE
May 18, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 16, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 14, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 1, 2013 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 19, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Nov 7, 2011 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Mar 11, 2011 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 25, 2008 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 3, 2008 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Dec 24, 2007 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 26, 2007 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 19, 2007 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 11, 2006 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 11, 2006 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 6, 2006 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED