Bronx Highbridge
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 2-02533-0086), so they can include other buildings on the same lot.
87 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Oct 21, 2026 | C | NOV SENT OUT | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT DOOR LEADING TO REAR YARD AT PUBLIC HALL, 1st STORY |
| Oct 14, 2026 | C | FALSE CERTIFICATION | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT DOOR LEADING TO REAR YARD AT PUBLIC HALL, 1st STORY |
| Aug 18, 2026 | B | NOV CERTIFIED ON TIME | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE CEILING WITH FIRE RETARDANDT MATERIAL AT PUBLIC HALL, 6th STORY |
| Aug 18, 2026 | B | CIV14 MAILED | 2D | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT ALL PLUMBING FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Aug 18, 2026 | C | NOV CERTIFIED ON TIME | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM |
| Aug 18, 2026 | C | INVALID CERTIFICATION | 2D | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2D , 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Aug 18, 2026 | A | NOV CERTIFIED ON TIME | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY |
| Aug 18, 2026 | B | NOV CERTIFIED ON TIME | Not available | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 6th STORY |
| Aug 16, 2026 | B | NOV CERTIFIED ON TIME | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING AT PUBLIC HALL, 6th STORY |
| Aug 16, 2026 | C | NOV CERTIFIED ON TIME | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM |
| Aug 16, 2026 | C | INVALID CERTIFICATION | 2D | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Aug 16, 2026 | A | NOV CERTIFIED ON TIME | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL AT PUBLIC HALL, 6th STORY |
| Aug 16, 2026 | B | NOV CERTIFIED ON TIME | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY |
| Aug 16, 2026 | B | NOV CERTIFIED ON TIME | Not available | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 6th STORY |
| Aug 1, 2026 | B | NOV SENT OUT | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ITS ASSEMBLIES AT DOOR LEADING TO NORTH YARD. AT PUBLIC HALL, 1st STORY |
| Aug 1, 2026 | C | NOV SENT OUT | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT DOOR LEADING TO NORTH YARD AT PUBLIC HALL, 1st STORY |
| Jul 22, 2026 | B | NOT COMPLIED WITH | Not available | § 27-2005 ADM CODE PROVIDE APPROVE GLASS AT SIDELIGHT AT LAUNDRY ROOM AT PUBLIC HALL, 1ST STORY |
| Jul 22, 2026 | B | NOT COMPLIED WITH | Not available | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS INSTALLED AT SIDELIGHT AT LAUNDRY ROOM AT PUBLIC HALL, 1ST STORY |
| Jul 22, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR LEADING TO NORTH YARD AT PUBLIC HALL, 1ST STORY |
| Jul 22, 2026 | C | NOV SENT OUT | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT WINDOW AT NORTH WALL AT PUBLIC HALL, 1ST STORY |
| Jul 8, 2026 | C | NOT COMPLIED WITH | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT FIRE DOOR LEADING TO NORTH YARD AT 1ST STORY PUBLIC HALL |
| Jul 8, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT LAUNDRY ROOM DOOR AT 1ST STORY PUBLIC HALL |
| Jul 8, 2026 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBLIES AT VESTIBULE DOOR AT 1ST STORY PUBLIC HALL |
| Jul 8, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE DOOR AT 1ST STORY |
| Jul 5, 2026 | C | NOV SENT OUT | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM |
| Jul 5, 2026 | C | VIOLATION DISMISSED | 2D | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Jun 29, 2026 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING AT PUBLIC HALL, 6th STORY |
| Jun 29, 2026 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY |
| Jun 29, 2026 | B | NOT COMPLIED WITH | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBL AT 1ST STORY PUBLIC HALL TO EAST YARD , 1st STORY |
| Jun 29, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH TO DOOR AT EAST YARD , 1st STORY |
| Jun 29, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH TO DOOR AT VESTIBULE , 1st STORY |
| Jun 29, 2026 | B | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBLY TO DOOR FROM STREET TO VESTIBULE , 1st STORY |
| Jun 29, 2026 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH TO DOOR FROM STREET TO VESTIBULE , 1st STORY |
| Oct 2, 2025 | C | VIOLATION DISMISSED | Not available | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM FROM NORTH COURTYARD DOOR LOCKED TO BOILER ROOM |
| Oct 2, 2025 | B | NOV CERTIFIED LATE | 4A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WARPED WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 2, 2025 | B | NOV SENT OUT | 4A | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AND ALL WALL OUTLETS IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Oct 2, 2025 | C | VIOLATION DISMISSED | 1A | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Feb 6, 2024 | B | VIOLATION DISMISSED | 4A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH IN THE 2nd ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2024 | B | VIOLATION DISMISSED | 4A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2024 | B | VIOLATION DISMISSED | 4A | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2024 | B | VIOLATION DISMISSED | 4A | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 6, 2024 | B | VIOLATION DISMISSED | 1A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 6, 2024 | B | VIOLATION DISMISSED | 1A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH IN THE 1st ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 10, 2024 | B | VIOLATION DISMISSED | Not available | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF FURNITURE UNDER THE STAIRS AT PUBLIC HALL, 1st STORY |
| Jan 10, 2024 | B | VIOLATION DISMISSED | 2A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 10, 2024 | B | VIOLATION DISMISSED | 2A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Dec 4, 2023 | A | VIOLATION CLOSED | Not available | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER 1ST FIRE ESCAPE ON BUILDING( SOUTHWALL FROM EAST SHOE (WELD) BUILDING MAIN ENTRANCE |
| Nov 29, 2023 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE AT HOPPER CHUTE DOOR AT 2ND STORY PUBLIC HALL |
| Nov 29, 2023 | A | VIOLATION CLOSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT 3RD STORY PUBLIC HALL |
| Nov 29, 2023 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AT 3RD STORY PUBLIC HALL |