NYC Building Report

Bronx University Heights (South)-Morris Heights

140 West 174 Street, Bronx

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

94 records

Date Status Type Summary
May 21, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. EXP#3 MULTIPLE STEP CRACKS AND DAMAGED BRICK FACE IN MULTIPLE LOCATION. OBSERVED PUSHOUT LINTEL. AT EXP#4 OBSERVED STEP CRACK IN BRICK WORK. REMEDY: REPAIR AND/OR REPLACE
Jun 23, 2024 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
Nov 1, 2023 V-DOB VIOLATION - ACTIVE FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED FAILURE TO CORRECT SWARMP CONDITIONS
Nov 1, 2023 V-DOB VIOLATION - ACTIVE FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED FAILURE TO CORRECT SWARMP CONDITIONS
Sep 8, 2023 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9B UNSAFE REPORT FILED
Sep 1, 2023 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9B UNSAFE REPORT FILED
Aug 29, 2023 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9B UNSAFE REPORT FILED
Aug 29, 2023 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9B UNSAFE REPORT FILED
Aug 29, 2023 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9B UNSAFE REPORT FILED
Aug 25, 2023 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9B UNSAFE REPORT FILED
Feb 22, 2023 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 22, 2023 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Dec 17, 2021 V*-DOB VIOLATION - DISMISSED HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED FAILURE TO PERFORM CATEGORY 5 INSPECTION
Feb 20, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED NYCHA CYLE 8 UNSAFE REPORT FILED
Feb 18, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED NYCHA CYLE 8 UNSAFE REPORT FILED
Feb 18, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED NYCHA CYLE 8 UNSAFE REPORT FILED
Feb 7, 2020 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED NYCHA UNSAFE CYCLE 8 REPORT FILED
Apr 5, 2019 V*-DOB VIOLATION - DISMISSED HVIOS-NYCHA ELEV ANNUAL INSPECTION/TEST ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
Jul 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Mar 27, 2018 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2017
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
May 12, 2014 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
May 12, 2014 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
May 12, 2014 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
May 12, 2014 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
May 12, 2014 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
May 12, 2014 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
May 12, 2014 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL CYCLE 7 UNSAFE REPORT FILED
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Aug 30, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Sep 17, 2008 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
Sep 17, 2008 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
Sep 17, 2008 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
Sep 17, 2008 V*-DOB VIOLATION - DISMISSED LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL