Bronx Mount Eden-Claremont (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 25, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT; NOTED AT BASEMENT LEVEL ERECTED VARIOUS FULL HEIGHT PARTITIONS TO SUB-DIVIDE CELLAR TO CREATE BATHROOM, AND 1 ADDITIONAL ROOM. INSTALLED ADDITIONAL ELECTRICAL LINES FOR LIGHT, SWITCHES, AND OUTLETS. INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK, 3-PIECE BATHROOM (TOILET, SINK, SHOWER). INSTALLED GAS LINE FOR |
| May 25, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | RESIDENCE ALTERED; NOTED BUILDING DEPARTMENT RECORDS INDICATES BUILDING AS 2 STORY 2 FAMILY, FIRST FLOOR AS 1 FAMILY, SECOND FLOOR AS 1 FAMILY, BASEMENT AS ORDINARY. BASEMENT IS NOW SET-UP AND ARRANGED AS A CLASS A APARTMENT WITH A KITCHEN WITH A RESIDENTIAL SINK, GAS STOVE, A 3-PIECE BATHROOM (TOILET, SINK, SHOWER) AND 1 ADDITIONAL |
| Mar 27, 2001 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |