Bronx Highbridge
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 10, 2008 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ED AMMENDMENTS WORK NOTED @ 1ST FLOOR THE CEILINGS HAVE BEEN LOWERED, WITH MTL FURRING STRIPS, AND FRAMING NEW METAL WALLS TEMPORARY SHORING AT THE 2ND FL THERE WERE NEW FLOOR JOISTS INSTALLED @ 1ST FLOOR NOT I NDICATED ON PLANS REMEDY: STOP ALL WORK CONFORM TO APPROVED DOCUMENTS |