Bronx Mount Eden-Claremont (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 7, 2025 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | CEASE USE DUE TO WATER DAMAGE |
| Mar 7, 2025 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | CEASE USE DUE TO WATER DAMAGE |
| Mar 4, 2025 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | CLASS 1: CEASE USE: SPRINKLER HEAD BROKE CAUSING FLOODING IN THE HOISTWAY. ENTIRE DEVICE HAS WATER DAMAGED & INOPERATIVE. |
| Mar 4, 2025 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | CLASS 1: CEASE USE: SPRINKLER HEAD BROKE CAUSING FLOODING IN THE HOISTWAY. ENTIRE DEVICE HAS WATER DAMAGED & INOPERATIVE. REPAIR/REPLACE ALL PARTS & WIRING EFFECTED BY WATER DAMAGE (CU). |
| Dec 1, 2024 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Dec 1, 2023 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| May 2, 2023 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 6, 2020 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |